The Hook Lab / Changes Updated 2026-11-25
Tracker · Changefeed

What changed.

1,151 changesRSSJSONTracker

  1. Macquarie Data Centres ~200 MW Macquarie Park campus ·stage Announcedautomated ·2026-11-25 ·MAQ: Chief Executive's Address to Shareholders
  2. Pekin data centre proposal ·condition Cancelledwithdrawn by proponent ·2026-11-12 ·constructionreviewonline.com
  3. Green Data Socorro County ·condition Cancelledwithdrawn by proponent ·2026-11-11 ·morethanjustparks.com
  4. Jay data centre ·condition Pausedwithdrawn by proponent ·2026-11-10 ·sunjournal.com
  5. Jay data centre ·stage Planning lodged ·2026-11-10 ·sunjournal.com pressherald.com
  6. Project Green Mountain ·first on record · stage Planning lodged ·2026-11-09 ·thetimes-tribune.com globaldatacenters.net
  7. Cochise Supercomputer Campus ·stage Planning lodged ·2026-11-06 ·cochise.az.gov
  8. Amazon Somervell County data centre campus ·first on record · stage Announced ·2026-11-05 ·Amazon
  9. Amazon Wharton County data centre campus ·stage Announced ·2026-11-05 ·Amazon
  10. Getworks Kushiro container data centre ·first on record · stage Announced ·2026-11-05 ·cloud.watch.impress.co.jp energynews.pro Shulman Advisory
  11. Monarch Compute Campus ·stage Under construction ·2026-11-05 ·nscale.com
  12. Southeast Wyoming data centre campus ·first on record · stage Announced ·2026-11-05 ·blog.google
  13. Auburndale Technology Center ·stage Announcedautomated ·2026-11-04 ·How Auburndale Approved a Data Center in Polk County Without Ever Saying It Out Loud - NewsBreak Emera (EMA) Q3 2026 Earnings Call Transcript - AOL
  14. Auburndale Technology Center ·stage Planning lodged ·2026-11-04 ·tampabay28.com
  15. EdgeConneX Ashville data centres ·stage Under construction ·2026-11-04 ·stockanalysis.com
  16. Cochise Supercomputer Campus ·condition Contestedcommunity opposition ·2026-11-03 ·kjzz.org
  17. Cochise Supercomputer Campus ·first on record · stage Connection applied ·2026-11-03 ·kjzz.org
  18. Samsung SDS Gumi AI Data Center ·stage Under construction ·2026-11-03 ·biz.heraldcorp.com Baxtel
  19. West Richland Data Center Campus ·condition Contestedcommunity opposition ·2026-11-03 ·triyaknews.com
  20. West Richland Data Center Campus ·first on record · stage Announced ·2026-11-03 ·triyaknews.com
  21. Tsukuba West Smart IC data centre zone ·first on record · stage Announced ·2026-11-02 ·asahi.com
  22. Google Hermantown data centre ·condition Contested ·2026-10-31 ·mprnews.org
  23. Google Hermantown data centre ·stage Planning approved ·2026-10-31 ·mprnews.org
  24. Google Hermantown data centre ·first on record · stage Announced ·2026-10-30 ·hermantowndatacenter.com
  25. Hyundai Motor Group Saemangeum AI Data Center ·first on record · stage Announced ·2026-10-30 ·en.fnnews.com Baxtel
  26. Shikoku Electric Nanyo AI data centre ·first on record · stage Announced ·2026-10-30 ·nikkei.com
  27. TerraVolt Declo campus ·first on record · stage Announced ·2026-10-30 ·sec.gov usdatacenterprojects.com kivitv.com
  28. Aurora Energy Precinct AI data centre ·first on record · stage Announced ·2026-10-29 ·kalkinemedia.com pv-magazine-australia.com
  29. Prometheus Hyperscale Natrona County campus ·condition Cancelledwithdrawn by proponent ·2026-10-29 ·buffalobulletin.com cowboystatedaily.com
  30. Sharon AI Albury campus ·stage Announced ·2026-10-29 ·forbes.com.au
  31. Hokkaido Government data centre site, Tomakomai ·stage Announced ·2026-10-28 ·Shulman Advisory
  32. Hokkaido Government data centre sites, Ishikari ·stage Announced ·2026-10-28 ·Shulman Advisory
  33. Beltline Energy Oklahoma City ·first on record · stage Planning approved ·2026-10-27 ·news9.com
  34. Eatonton 379 Data Center campus ·first on record · stage Planning lodged ·2026-10-26 ·constructionreviewonline.com
  35. Roswell Information Park ·first on record · stage Announced ·2026-10-25 ·abqjournal.com
  36. T5@Chicago IV ·stage Connection offered ·2026-10-25 ·everydatacenter.com
  37. Teraplex Gallup Tradeport ·condition Cancelled ·2026-10-25 ·abqjournal.com
  38. Teraplex Gallup Tradeport ·first on record · stage Announced ·2026-10-25 ·abqjournal.com
  39. Project Meridien ·first on record · stage Planning lodged ·2026-10-22 ·reneweconomy.com.au
  40. Hokkaido Government data centre site, Tomakomai ·first on record · stage Connection applied ·2026-10-20 ·pref.hokkaido.lg.jp
  41. Hokkaido Government data centre sites, Ishikari ·first on record · stage Connection applied ·2026-10-20 ·pref.hokkaido.lg.jp
  42. Firmus Wesley Vale AI Factory ·condition Contestedcommunity opposition ·2026-10-19 ·The Urban Developer
  43. Google Van Buren Township data centre ·stage Planning approved ·2026-10-19 ·planetdetroit.org
  44. TS Trillion Cheonan AI Data Center ·stage Connection offered ·2026-10-16 ·Asia Economy
  45. TS Trillion Cheonan AI Data Center ·stage Planning approved ·2026-10-16 ·Asia Economy
  46. TS Trillion Cheonan AI Data Center ·first on record · stage Announced ·2026-10-16 ·Asia Economy
  47. Amazon Richmond County data centre campus ·stage Under construction ·2026-10-15 ·DCD
  48. Amazon Wharton County data centre campus ·first on record · stage Planning lodged ·2026-10-15 ·DCD
  49. Ansan OUR Data Centre ·stage Announced ·2026-10-15 ·fnnews.com
  50. Area Group Delapan data centre campus ·stage Under construction ·2026-10-15 ·DCD
  51. AWS Homer City campus ·stage Planning lodged ·2026-10-15 ·DCD
  52. Bundang IDC ·first on record · milestone Ownership changed ·2026-10-15 ·fnnews.com
  53. Cloud Centers Lisle data centre ·first on record · stage Planning lodged ·2026-10-15 ·DCD
  54. DayOne Kodaira ·first on record · stage Under construction ·2026-10-15 ·DCD
  55. DC BLOX Nashville ·condition Contestedplanning approval ·2026-10-15 ·DCD
  56. DC BLOX Nashville ·stage Planning approved ·2026-10-15 ·DCD
  57. DC BLOX Nashville ·stage Planning lodged ·2026-10-15 ·DCD
  58. Diode Ventures Peculiar campus ·stage Planning approved ·2026-10-15 ·DCD
  59. EdgeConneX Ashville data centres ·first on record · condition Contestedcommunity opposition ·2026-10-15 ·DCD sciotopost.com
  60. ESR Higashi Kurume Data Centre ·first on record · milestone Ownership changed ·2026-10-15 ·DCD
  61. Gregory Road Data Center ·first on record · stage Planning lodged ·2026-10-15 ·DCD
  62. KOEN-Samsung C&T Dangjin hydrogen-powered hyperscale DC ·first on record · stage Announced ·2026-10-15 ·DCD
  63. Microsoft Dorr Township site ·first on record · stage Announced ·2026-10-15 ·DCD
  64. Microsoft Elk Grove Village datacenter ·stage Planning lodged ·2026-10-15 ·DCD
  65. Microsoft Elk Grove Village datacenter ·first on record · stage Under construction ·2026-10-15 ·DCD
  66. Microsoft Wellington datacenter site ·first on record · stage Planning lodged ·2026-10-15 ·DCD
  67. Provident Chesterton data centre ·condition Contestedcommunity opposition ·2026-10-15 ·DCD
  68. Province Group Powhatan campus ·stage Planning approved ·2026-10-15 ·DCD
  69. Riot Corsicana campus ·stage Planning lodged ·2026-10-15 ·DCD
  70. STACK Berry Hill megasite campus ·first on record · stage Announced ·2026-10-15 ·DCD
  71. Stargate Milam County ·first on record · stage Under construction ·2026-10-15 ·datacenterriskatlas.org
  72. Switch Foundry West ·stage Planning lodged ·2026-10-15 ·DCD
  73. Vantage Pittsboro data centre ·stage Planning lodged ·2026-10-15 ·DCD
  74. Vantage Reno ·stage Planning lodged ·2026-10-15 ·DCD
  75. Village Place Technology Park ·first on record · stage Planning approved ·2026-10-15 ·DCD
  76. Prometheus Hyperscale Natrona County campus ·first on record · stage Announced ·2026-10-14 ·trib.com
  77. Lucca Road Data Centre Wyong ·first on record · stage Planning lodged ·2026-10-13 ·newcastleherald.com.au
  78. Pohang Gwangmyeong Global AI Data Center ·stage Planning approved ·2026-10-13 ·Mingtiandi
  79. Ansan OUR Data Centre ·first on record · stage Under construction ·2026-10-12 ·fnnews.com
  80. CDC Gregadoo Campus ·first on record · stage Planning lodged ·2026-10-12 ·Wagga Wagga City Council
  81. Accokeek Center data campus ·first on record · stage Planning approved ·2026-10-08 ·Potomac Local
  82. MC Digital Realty KIX campus ·first on record · stage Under construction ·2026-10-08 ·technode.global Baxtel
  83. SK Securities Sejong AI data centre ·first on record · stage Announced ·2026-10-08 ·fnnews.com en.fnnews.com
  84. Big Woods Technology Park ·first on record · stage Announced ·2026-10-07 ·mississippifreepress.org
  85. 5C MEM01 ·stage Planning lodged ·2026-10-06 ·Data Center Frontier
  86. Mitsui Fudosan Kobe tunnel underground data centre ·first on record · stage Announced ·2026-10-06 ·cloud.watch.impress.co.jp note.com
  87. Yaita City data centre cluster ·first on record · stage Announced ·2026-10-06 ·Shulman Advisory
  88. AVAIO Project Hercules ·condition Contestedcommunity opposition ·2026-10-05 ·Cardinal News
  89. AVAIO Project Hercules ·stage Planning approved ·2026-10-05 ·Cardinal News
  90. Centuria Clayton DC1 replacement ·first on record · stage Planning lodged ·2026-10-03 ·Real Estate Source
  91. DayOne Imari campus ·first on record · stage Announced ·2026-10-02 ·dayonedc.com
  92. Grande Valley Industrial Data Center Campus ·first on record · stage Planning approved ·2026-10-01 ·everydatacenter.com
  93. Vantage Trident Data Center ·first on record · condition Contestedcommunity opposition ·2026-10-01 ·coloradopolitics.com
  94. Digital Realty Kokomo ·first on record · stage Announced ·2026-10 ·DCD datacenters.economictimes.indiatimes.com Digital Realty
  95. Meta Mason County data centre campus ·first on record · stage Announced ·2026-10 ·States Newsroom
  96. NEXTDC M3 ·first on record · condition Delayednetwork works delayed ·2026-10 ·ASX announcement
  97. Tungkillo Compute and Energy Hub ·first on record · condition Contestedcommunity opposition ·2026-10 ·Quantum DC DCD ABC News constructionreviewonline.com
  98. DC BLOX Thunderbird Data Center ·stage Planning approved ·2026-09-30 ·thebutlercollegian.com
  99. DC BLOX Thunderbird Data Center ·first on record · stage Under construction ·2026-09-30 ·thebutlercollegian.com
  100. Firmus Wesley Vale AI Factory ·condition Pausedplanning approval ·2026-09-30 ·ABC News
  101. Aerotropolis Logistics Center data centres ·first on record · stage Planning lodged ·2026-09-29 ·sentinelcolorado.com
  102. Amazon King George campus ·condition ended Resumed ·2026-09-29 ·fredericksburgfreepress.com
  103. Amazon King George campus ·condition Contestedplanning approval ·2026-09-29 ·fredericksburgfreepress.com
  104. Amazon King George campus ·stage Announced ·2026-09-29 ·fredericksburgfreepress.com
  105. Amazon King George campus ·first on record · stage Planning approved ·2026-09-29 ·Data Center Frontier
  106. CDC Beard 2 ·first on record · stage Planning approved ·2026-09-29 ·Real Estate Source certifiedstrategic.com
  107. CloudHQ Project Asahi ·first on record · stage Announced ·2026-09-29 ·retailnews.asia
  108. Henderson federal land data centre ·stage Planning lodged ·2026-09-28 ·reviewjournal.com
  109. Project Raptor ·condition Contested ·2026-09-28 ·txdatacenterwatch.com
  110. Henderson federal land data centre ·first on record · condition Cancelledplanning approval ·2026-09-24 ·reviewjournal.com GovTech
  111. CDC Hazelmere ·first on record · stage Announced ·2026-09-23 ·businessnews.com.au
  112. Open DC PE2 Penang ·stage Energised ·2026-09-23 ·Tech Wire Asia
  113. PGIM Truganina Building 1 ·first on record · stage Planning approved ·2026-09-23 ·Real Estate Source
  114. HyperDC MBL1 ·first on record · stage Planning lodged ·2026-09-22 ·The Urban Developer
  115. Rhea Data Center ·first on record · stage Planning lodged ·2026-09-21 ·idahonews.com
  116. Misty Hollow Energy and Data Campus ·first on record · stage Planning lodged ·2026-09-19 ·butlereagle.com butlereagle.com
  117. Daecheong Dam hydrothermal energy complex AI data centre ·first on record · stage Announced ·2026-09-18 ·yna.co.kr ccreview.co.kr k-lifetv.co.kr
  118. Project River ·condition Contestedcommunity opposition ·2026-09-18 ·newschannel9.com
  119. Armory Innovation District data centre ·condition Contestedplanning approval ·2026-09-17 ·stlpr.org
  120. Project Taurus ·stage Planning approved ·2026-09-16 ·coloradopolitics.com
  121. Project Taurus ·first on record · stage Planning lodged ·2026-09-16 ·coloradopolitics.com
  122. Elizabeth Township data centre campus ·first on record · stage Announced ·2026-09-15 ·publicsource.org
  123. Apple Waukee data centre ·stage Energised ·2026-09-14 ·DCD
  124. Archbald Data & Energy Center ·stage Announced ·2026-09-14 ·DCD
  125. Bosung Group ·first on record · stage Announced ·2026-09-14 ·DCD
  126. Bridge Data Centres MY07 ·first on record · stage Connection offered ·2026-09-14 ·DCD
  127. Busan Yeongdo AI Data Center ·first on record · stage Connection offered ·2026-09-14 ·DCD
  128. Compass Red Oak campus ·first on record · stage Planning lodged ·2026-09-14 ·DCD
  129. DataBank Ashburn ·first on record · stage Under construction ·2026-09-14 ·DCD
  130. Digital Halo JHB1 ·stage Announced ·2026-09-14 ·DCD
  131. Edged Council Bluffs ·stage Planning lodged ·2026-09-14 ·DCD
  132. Firmus Launceston AI Factory campus ·first on record · stage Planning approved ·2026-09-14 ·DCD
  133. Forsyth data centre campus ·stage Planning approved ·2026-09-14 ·DCD
  134. Glendenning Road Data Centre ·first on record · stage Planning approved ·2026-09-14 ·Telecompaper certifiedstrategic.com
  135. Google Lea County ·first on record · stage Announced ·2026-09-14 ·abqjournal.com abqjournal.com
  136. Google Stillwater data centre ·stage Planning lodged ·2026-09-14 ·DCD
  137. Karis Critical Merrillville data centre ·first on record · stage Planning approved ·2026-09-14 ·DCD
  138. Mooresville Technology Park ·condition Contestedcommunity opposition ·2026-09-14 ·DCD
  139. NFD Korea Dangjin 300 MW AI campus ·stage Connection offered ·2026-09-14 ·completeaitraining.com Mingtiandi
  140. Project Sail ·stage Planning lodged ·2026-09-14 ·DCD
  141. Prologis Shelbyville data centre campus ·first on record · stage Planning lodged ·2026-09-14 ·DCD
  142. QTS East Windsor ·stage Planning lodged ·2026-09-14 ·DCD
  143. QTS Richmond 4 ·stage Planning lodged ·2026-09-14 ·DCD
  144. STACK Nokesville Road site ·first on record · stage Planning lodged ·2026-09-14 ·DCD
  145. TA Realty East Tanners Church Road data centre ·stage Planning approved ·2026-09-14 ·DCD
  146. TA Realty East Tanners Church Road data centre ·first on record · stage Planning lodged ·2026-09-14 ·DCD
  147. Thor Equities Augusta Township data centre ·stage Announced ·2026-09-14 ·DCD
  148. Vantage Fredericksburg ·first on record · stage Announced ·2026-09-14 ·DCD
  149. Vantage KUL1 Cyberjaya campus ·first on record · milestone Ownership changed ·2026-09-14 ·DCD
  150. Aligned Project Phoenix ·first on record · stage Under construction ·2026-09-10 ·usdatamap.com
  151. AWS Homer City campus ·first on record · condition Delayedplanning approval ·2026-09-09 ·Data Center Frontier
  152. fantasista Sendai AI data center ·first on record · stage Announced ·2026-09-09 ·voix.jp cafe-dc.com kensetsunews.com
  153. DAMAC Digital Edgerton data centre ·stage Planning approved ·2026-09-08 ·edgertonks.org
  154. Nebo North data centre campus ·condition Contestedcommunity opposition ·2026-09-08 ·sltrib.com everydatacenter.com
  155. Project Thunderbird ·first on record · stage Announced ·2026-09-08 ·projectthunderbird.com okcfox.com
  156. TECfusions Keystone Connect ·condition Contestedplanning approval ·2026-09-08 ·penncapital-star.com
  157. Tech One Crossing ·first on record · stage Planning lodged ·2026-09-08 ·wowt.com
  158. Project Tomahawk ·first on record · stage Planning lodged ·2026-09-04 ·project-tomahawk-prospertx.com
  159. Provident and Northampton North Dallas data centre ·first on record · stage Announced ·2026-09-04 ·hoodline.com providentdatacenters.net
  160. Black Mountain Fort Worth campus ·first on record · stage Announced ·2026-09-02 ·fortworthreport.org
  161. Diode Ventures Peculiar campus ·condition Contestedcommunity opposition ·2026-09-02 ·iowapublicradio.org
  162. Goodman Project Apollo ·first on record · stage Planning approved ·2026-09-02 ·NSW planning portal
  163. QTS Clinton ·first on record · stage Announced ·2026-09-02 ·wvik.org wvik.org
  164. Firmus Wesley Vale AI Factory ·first on record · stage Planning lodged ·2026-09-01 ·North West Environment Centre ABC News
  165. T5@Chicago IV ·stage Planning approved ·2026-09-01 ·capitolfax.com everydatacenter.com
  166. Kingston Technology Hub ·first on record · stage Planning lodged ·2026-09 ·malachi.energy Bisnow
  167. NFD Korea Dangjin 300 MW AI campus ·first on record · stage Planning approved ·2026-09 ·Mingtiandi
  168. Sharon AI Albury campus ·first on record · milestone Ownership changed ·2026-09 ·forbes.com.au
  169. T5 Project Charlie ·first on record · stage Planning lodged ·2026-09 ·ffxnow.com
  170. Vantage Project Latigo ·first on record · stage Planning approved ·2026-09 ·nearbydatacenters.org Blackridge Research
  171. Applied Digital Ellendale hosting facility ·first on record · stage Energised ·2026-08-31 ·Applied Digital
  172. Madison Heights data centre ·first on record · stage Planning lodged ·2026-08-31 ·wset.com Cardinal News
  173. Kasumigaseki Capital Zama data centre ·stage Connection offered ·2026-08-28 ·voix.jp
  174. Kasumigaseki Capital Zama data centre ·first on record · stage Announced ·2026-08-28 ·voix.jp
  175. Container DC Park Ota ·first on record · stage Announced ·2026-08-27 ·cloud.watch.impress.co.jp
  176. Google Project Roman ·first on record · stage Announced ·2026-08-27 ·The Texas Tribune nearbydatacenters.org
  177. GW Ranch ·stage Planning lodged ·2026-08-27 ·enr.com
  178. GW Ranch ·milestone Ownership changed ·2026-08-27 ·enr.com
  179. GW Ranch ·stage Planning approved ·2026-08-27 ·enr.com energytech.com pacificoenergy.com
  180. La Osa Energy Center ·stage Planning approved ·2026-08-27 ·kjzz.org
  181. Project River ·first on record · stage Announced ·2026-08-27 ·timesfreepress.com newschannel9.com
  182. La Osa Energy Center ·first on record · stage Planning lodged ·2026-08-26 ·kjzz.org
  183. Amazon Calvert County data centre campus ·stage Announced ·2026-08-25 ·thebanner.com
  184. AVAIO Project Leo ·stage Planning approved ·2026-08-25 ·avaiodigital.com
  185. Changwon Yangdeok-dong AI data centre ·first on record · condition Contestedcommunity opposition ·2026-08-25 ·twig24.com
  186. Firmus Bell Bay AI Factory ·stage Planning approved ·2026-08-25 ·abc.net.au
  187. Firmus Bell Bay AI Factory ·first on record · stage Planning lodged ·2026-08-21 ·abc.net.au
  188. Hayward Exchange @ 92 ·stage Energised ·2026-08-21 ·hayward-ca.gov
  189. Project Gold ·stage Planning lodged ·2026-08-21 ·thetimes-tribune.com
  190. Dohwa Data Centre ·condition Contestedcommunity opposition ·2026-08-20 ·Asia Economy
  191. Skybox Austin I ·stage Under construction ·2026-08-20 ·Skybox
  192. Google Tulsa data centre ·first on record · stage Announced ·2026-08-19 ·bealeinfra.com
  193. Project Red Clay ·first on record · stage Connection applied ·2026-08-19 ·Inside Climate News
  194. YTL-JLand STeP West campus ·first on record · stage Announced ·2026-08-19 ·ytlpowerinternational.com The Star
  195. Amazon Shreveport data centre campus ·first on record · stage Announced ·2026-08-18 ·Amazon
  196. Taylor Technology Campus ·first on record · condition Delayedplanning approval ·2026-08-18 ·taylortx.gov
  197. Benthaus Texarkana AI campus ·stage Connection offered ·2026-08-17 ·theenergymag.com
  198. Cologix COL5 ·first on record · milestone Ownership changed ·2026-08-17 ·sec.gov
  199. Compass El Mirage campus ·first on record · stage Planning approved ·2026-08-17 ·arizonaai.com
  200. Syncline Victorian AI Centre ·first on record · condition Contestedcommunity opposition ·2026-08-17 ·The Guardian
  201. Western Downs Digital Park ·first on record · stage Planning lodged ·2026-08-17 ·Western Downs Digital Park ABC News yourneighbourhood.com.au certifiedstrategic.com
  202. 900 Conshohocken Road data centre campus ·stage Planning lodged ·2026-08-12 ·chestnuthilllocal.com
  203. Dermody Rubbertown data centre ·first on record · stage Planning lodged ·2026-08-12 ·lpm.org
  204. U-M and Los Alamos computing facility ·stage Announced ·2026-08-12 ·ypsitownship.org
  205. Busan Eco Delta Green Data Center ·stage Connection offered ·2026-08-11 ·breezeinflow.com
  206. SIC Quantum Data Centre ·first on record · stage Announced ·2026-08-11 ·robusthpc.com datacenters.economictimes.indiatimes.com
  207. Amazon Pecos County data centre campus ·stage Announced ·2026-08-10 ·Amazon
  208. DPS Resources Bukit Rambai AI data centre ·first on record · stage Planning lodged ·2026-08-10 ·koa.international
  209. Flexential Talty campus ·first on record · stage Announced ·2026-08-10 ·coloradobiz.com
  210. 900 Conshohocken Road data centre campus ·condition Contested ·2026-08-07 ·6abc.com chestnuthilllocal.com
  211. Starpointe Business Park data centre campus ·condition Contestedplanning approval ·2026-08-06 ·cbsnews.com observer-reporter.com
  212. CDC Kemps Creek Campus ·first on record · stage Planning lodged ·2026-08-05 ·DCD btw.media
  213. Amazon Pecos County data centre campus ·first on record · stage Planning lodged ·2026-08-04 ·finance.yahoo.com
  214. Solaseado Data Center Park ·first on record · stage Under construction ·2026-08-04 ·thelec.net
  215. Swanbank data centre ·first on record · stage Planning lodged ·2026-08-04 ·DCD Springfield Lakes News certifiedstrategic.com
  216. Thor Equities Augusta Township data centre ·first on record · condition Cancelledplanning approval ·2026-08-04 ·The Gander
  217. AI Fabric Jangseong AI data centre ·first on record · stage Announced ·2026-08-03 ·news.mtn.co.kr
  218. CyrusOne Freestone County Data Center ·stage Planning lodged ·2026-08-03 ·usdatacenterprojects.com DCD
  219. National AI Computing Center ·stage Connection applied ·2026-08-03 ·zdnet.co.kr
  220. National AI Computing Center ·first on record · stage Under construction ·2026-08-03 ·zdnet.co.kr
  221. Yondr Manassas ·first on record · stage Announced ·2026-08-03 ·Yondr compute-atlas.com
  222. Ishikari Renewable Energy Data Center No. 1 ·first on record · stage Energised ·2026-08-01 ·cloud.watch.impress.co.jp
  223. Amazon Calvert County data centre campus ·condition Cancelled ·2026-08 ·thebanner.com calvertcountymd.gov
  224. Utsunomiya Shin-Tochigi substation DC site ·first on record · stage Announced ·2026-07-31 ·city.utsunomiya.lg.jp
  225. Bridgefield Tech Center ·first on record · stage Planning lodged ·2026-07-30 ·loudoun.gov Data Center Frontier
  226. Galaxy McGregor campus ·first on record · stage Announced ·2026-07-28 ·galaxy.com investor.galaxy.com sec.gov
  227. TAC Data Centers Great Falls campus ·condition Cancelledwithdrawn by proponent ·2026-07-28 ·montanafreepress.org
  228. Amazon Project Rise ·stage Announced ·2026-07-27 ·DCD
  229. Amazon third Louisa County campus ·stage Planning lodged ·2026-07-27 ·DCD
  230. Applied Digital Toronto campus ·first on record · stage Announced ·2026-07-27 ·DCD
  231. Bolingbroke Technology Campus ·first on record · stage Planning lodged ·2026-07-27 ·DCD
  232. Changwon defence AI data centre ·first on record · stage Announced ·2026-07-27 ·changwon.go.kr
  233. Cloudburst San Marcos campus ·first on record · stage Announced ·2026-07-27 ·DCD
  234. CyrusOne Richardson DFW6 ·first on record · stage Planning lodged ·2026-07-27 ·DCD
  235. CyrusOne Yorkville Technology Campus ·stage Planning lodged ·2026-07-27 ·DCD
  236. DCI DRW01 Darwin ·first on record · stage Announced ·2026-07-27 ·DCD
  237. Deep Green Lansing data centre ·stage Announced ·2026-07-27 ·DCD
  238. Deep Green Lansing data centre ·first on record · condition Cancelledwithdrawn by proponent ·2026-07-27 ·DCD The Gander
  239. EdgeCore Reno ·stage Connection offered ·2026-07-27 ·DCD
  240. Google Mesa data centre ·milestone Renamed ·2026-07-27 ·DCD
  241. Google Mesa data centre ·first on record · stage Under construction ·2026-07-27 ·DCD
  242. Joule Millard County campus ·first on record · stage Planning approved ·2026-07-27 ·joulepower.ai ksl.com
  243. Keel Sharon campus ·first on record · stage Planning approved ·2026-07-27 ·DCD
  244. Kentucky River campus ·first on record · stage Announced ·2026-07-27 ·DCD States Newsroom
  245. Northern Data Maysville HPC data centre ·first on record · stage Announced ·2026-07-27 ·DCD
  246. Novva Las Vegas ·stage Announced ·2026-07-27 ·DCD
  247. Project Splice ·first on record · stage Planning lodged ·2026-07-27 ·DCD
  248. QTS Blakely ·stage Planning lodged ·2026-07-27 ·DCD
  249. STACK Loudoun County campus ·first on record · stage Announced ·2026-07-27 ·DCD
  250. Stream ATLA ·first on record · stage Planning lodged ·2026-07-27 ·DCD
  251. T5@Chicago III ·stage Under construction ·2026-07-27 ·DCD
  252. Western Hospitality Partners Oldham County data centre ·stage Planning lodged ·2026-07-27 ·DCD
  253. Western Hospitality Partners Oldham County data centre ·first on record · condition Cancelledwithdrawn by proponent ·2026-07-27 ·DCD
  254. Mudiita Ransom Township data centre campus ·first on record · stage Announced ·2026-07-24 ·DCD
  255. Project Camellia ·first on record · stage Announced ·2026-07-24 ·tedmag.com
  256. Goodman Project Pluto ·stage Planning approved ·2026-07-23 ·certifiedstrategic.com dcpulse.com
  257. Highland Digital data centres at Prince William Forest Park ·first on record · stage Planning lodged ·2026-07-23 ·princewilliamtimes.com
  258. Meta Temple Data Center ·stage Energised ·2026-07-22 ·Meta
  259. Meta Temple Data Center ·first on record · stage Under construction ·2026-07-22 ·Meta
  260. SK consortium Saemangeum data centre ·condition Delayed ·2026-07-22 ·jjan.kr
  261. Spring Valley Technology Park ·first on record · stage Planning lodged ·2026-07-22 ·loudounnow.com
  262. TeraWulf Lake Hawkeye ·condition Contestedplanning approval ·2026-07-22 ·rochesterbeacon.com
  263. TeraWulf Lake Hawkeye ·first on record · stage Announced ·2026-07-22 ·rochesterbeacon.com
  264. Wagner Properties data centre ·stage Planning lodged ·2026-07-22 ·Richmond BizSense
  265. Aligned PHX-04 ·first on record · milestone Ownership changed ·2026-07-21 ·hoodline.com
  266. NuVu Petersburg campus ·stage Planning approved ·2026-07-21 ·wtvr.com
  267. Hut 8 Beacon Point campus ·first on record · stage Connection offered ·2026-07-20 ·sec.gov sec.gov
  268. Pohang Gwangmyeong Global AI Data Center ·first on record · stage Under construction ·2026-07-20 ·m.go.seoul.co.kr
  269. Crusoe Childress campus ·first on record · stage Announced ·2026-07-15 ·Crusoe
  270. Oakline at Mill Creek ·first on record · stage Announced ·2026-07-15 ·katu.com
  271. PowerHouse Louisville ·stage Planning approved ·2026-07-15 ·louisvilledatacenter.com
  272. Kingsboro data centre ·first on record · condition Contestedcommunity opposition ·2026-07-14 ·northcarolinahealthnews.org
  273. Applied Digital Polaris Forge 3 ·first on record · stage Planning lodged ·2026-07-13 ·valleynewslive.com
  274. QTS Hall County ·first on record · stage Announced ·2026-07-13 ·QTS lancium.com
  275. Kuwana data centre development site ·stage Connection applied ·2026-07-10 ·nikkei.com
  276. Kuwana data centre development site ·first on record · stage Announced ·2026-07-10 ·nikkei.com
  277. Silver Creek Data Center ·first on record · stage Planning lodged ·2026-07-10 ·houseberry.com
  278. GDC Banting data centre ·first on record · stage Announced ·2026-07-08 ·DCD
  279. Project Tembo ·first on record · milestone Renamed ·2026-07-08 ·laramiecountywy.gov cowboystatedaily.com
  280. Rushmark Rockland Road data centre ·first on record · stage Planning lodged ·2026-07-08 ·wjla.com
  281. Gangneung hyperscale data centre special zone ·condition Delayedno network capacity ·2026-07-07 ·fnnews.com
  282. Gangneung hyperscale data centre special zone ·first on record · stage Under construction ·2026-07-07 ·fnnews.com
  283. Prince William Digital Gateway ·condition Cancelledplanning approval ·2026-07-07 ·virginiabusiness.com
  284. Prince William Digital Gateway ·first on record · condition Contestedplanning approval ·2026-07-07 ·virginiabusiness.com
  285. DayOne Kapar site ·first on record · stage Announced ·2026-07-06 ·edgeprop.my
  286. Goodman Project Atlas ·first on record · condition Contestedcommunity opposition ·2026-07-06 ·NSW planning portal
  287. GS AI Infra Donghae AI data centre ·first on record · stage Announced ·2026-07-06 ·fnnews.com biz.chosun.com datacenters.economictimes.indiatimes.com
  288. Krambu Bonner data centre ·stage Planning lodged ·2026-07-06 ·montanafreepress.org
  289. TeraWulf Justified Data ·stage Announced ·2026-07-06 ·sec.gov
  290. Hanwha Changwon defence AI data centre ·first on record · stage Announced ·2026-07-03 ·en.sedaily.com
  291. Great Stream Commons data centre ·first on record · stage Planning lodged ·2026-07-02 ·radio.wpsu.org
  292. MARA Matagorda County campus ·first on record · milestone Ownership changed ·2026-07-02 ·sec.gov sec.gov
  293. South Hanover Township quarry data centres ·first on record · stage Planning lodged ·2026-07-02 ·GovTech DCD
  294. Applied Digital Polaris Forge 1 ·milestone Expanded ·2026-07-01 ·Applied Digital
  295. QTS Bessemer ·first on record · stage Planning approved ·2026-07-01 ·abc3340.com abc3340.com
  296. Crossroads Technology Campus ·first on record · condition Contestedcommunity opposition ·2026-07 ·datacentercensus.com wjla.com
  297. Goodman Truganina ·first on record · stage Planning lodged ·2026-07 ·Real Estate Source certifiedstrategic.com certifiedstrategic.com datacentremoratorium.net
  298. Calvert Infrastructure Hub ·first on record · stage Announced ·2026-06-30 ·beacondatacenters.com
  299. QTS Augusta ·first on record · stage Announced ·2026-06-30 ·QTS
  300. East Fishkill data centre ·stage Announced ·2026-06-26 ·wamc.org
  301. Pocheon Soheul IC data centre ·first on record · stage Announced ·2026-06-26 ·kyeonggi.com
  302. DC BLOX Nashville ·first on record · stage Announced ·2026-06-24 ·DC BLOX
  303. Silicon Foundation Energy Wheeling data centre ·first on record · stage Announced ·2026-06-24 ·wvpublic.org
  304. Microsoft Mount Pleasant datacenter campus ·stage Energised ·2026-06-23 ·Microsoft
  305. NTT West Hakata Data Center ·first on record · stage Announced ·2026-06-23 ·note.com
  306. Townsite Data Center ·condition Contestedcommunity opposition ·2026-06-23 ·GovTech
  307. Amazon Project Rise ·first on record · stage Planning approved ·2026-06-19 ·nwindianabusiness.com
  308. Amazon Potomac Church Tech Center ·first on record · stage Planning lodged ·2026-06-18 ·DCD
  309. Breaker Street data centre campus ·condition Contestedplanning approval ·2026-06-18 ·thetimes-tribune.com
  310. Copper Ridge ·condition Delayedplanning approval ·2026-06-18 ·DCD
  311. Sabey Butte data centre ·first on record · condition Cancelledwithdrawn by proponent ·2026-06-18 ·DCD
  312. STACK 78 Lockwood Road ·first on record · stage Planning lodged ·2026-06-18 ·DCD
  313. Microsoft La Porte datacenter ·first on record · stage Under construction ·2026-06-17 ·DCD Microsoft
  314. MRCB Bukit Jalil AI-ready data centre ·first on record · stage Announced ·2026-06-16 ·The Star
  315. Amazon Montgomery County data centre ·first on record · condition Contested ·2026-06-15 ·kbia.org
  316. Digi Power X Columbiana data centre ·stage Connection offered ·2026-06-13 ·accessnewswire.com
  317. Cave City hyperscale data centre site ·first on record · stage Announced ·2026-06-10 ·wbko.com
  318. AmpZ Lufkin data centre ·first on record · condition Contestedcommunity opposition ·2026-06-09 ·The Texas Tribune
  319. CyrusOne Lee County campus ·first on record · stage Planning lodged ·2026-06-09 ·rantnc.com
  320. Digital Realty Cyberjaya KUL10/KUL11 ·milestone Renamed ·2026-06-09 ·datacenters.economictimes.indiatimes.com
  321. Digital Realty Cyberjaya KUL10/KUL11 ·first on record · milestone Ownership changed ·2026-06-09 ·datacenters.economictimes.indiatimes.com Tech Wire Asia
  322. Keppel Ansan Global Meta Data Centre ·stage Planning approved ·2026-06-09 ·DCD
  323. Keppel Ansan Global Meta Data Centre ·first on record · stage Announced ·2026-06-09 ·DCD Keppel
  324. Tanco and China Mobile International Port Dickson data centre ·first on record · stage Announced ·2026-06-09 ·moomoo.com klsescreener.com
  325. CyrusOne Jack County ·first on record · condition Contestedcommunity opposition ·2026-06-08 ·GovTech
  326. Digital Edge SEL5 Ansan ·first on record · stage Announced ·2026-06-08 ·mlq.ai Mingtiandi
  327. Koramco-DCI Ansan Siwha AI Data Center ·stage Announced ·2026-06-08 ·mk.co.kr
  328. Spring Hill data centre ·first on record · condition Contestedcommunity opposition ·2026-06-08 ·DCD
  329. Google Pampa data centre ·first on record · stage Announced ·2026-06-05 ·newschannel10.com
  330. MD Squared Pikeville data centre ·first on record · stage Announced ·2026-06-05 ·servercountry.org States Newsroom
  331. Solstice Data Allen Park data centre ·first on record · condition Cancelledplanning approval ·2026-06-04 ·planetdetroit.org
  332. Google Palo data centre ·first on record · stage Announced ·2026-06-02 ·iowapublicradio.org
  333. Meta Piqua data centre ·first on record · stage Planning approved ·2026-06-02 ·piquaoh.gov
  334. Edged Fort Worth ·first on record · stage Planning lodged ·2026-06-01 ·IDCNova
  335. Stargate Michigan ·stage Under construction ·2026-06-01 ·cnbc.com
  336. 5C MEM01 ·milestone Ownership changed ·2026-06 ·Data Center Frontier
  337. Iron Horse data centre campus ·condition Delayed ·2026-06 ·Richmond BizSense
  338. Kenwood data centre ·condition Contestedcommunity opposition ·2026-06 ·rockinst.org
  339. Townsite Data Center ·first on record · stage Planning approved ·2026-06 ·blm.gov
  340. QTS Van Wert ·first on record · stage Announced ·2026-05-29 ·QTS DCD
  341. Goodman Sagamihara ·first on record · stage Announced ·2026-05-28 ·prnewswire.com
  342. Koramco-DCI Ansan Siwha AI Data Center ·first on record · stage Under construction ·2026-05-28 ·en.sedaily.com Asia Economy mk.co.kr
  343. Asa GK data centre, Hongo Industrial Park ·first on record · stage Announced ·2026-05-27 ·di-lab.biz
  344. RB Inyokern Data Center ·first on record · stage Planning lodged ·2026-05-27 ·California Energy Commission
  345. SoftBank Sakai AI DC ·first on record · stage Announced ·2026-05-27 ·di-lab.biz DCD
  346. TeraWulf Boyd and Greenup counties campus ·first on record · stage Announced ·2026-05-26 ·sec.gov sec.gov States Newsroom kentuckylantern.com
  347. AWS Wallula Gap Data Center Campus ·first on record · stage Planning lodged ·2026-05-22 ·wwcowa.gov
  348. Pennhurst data centre ·first on record · condition Cancelledplanning approval ·2026-05-21 ·chestnuthilllocal.com
  349. Google New Florence data centre ·first on record · stage Announced ·2026-05-20 ·governor.mo.gov DCD
  350. Sky City AI Data Center, Sacheon ·first on record · stage Planning approved ·2026-05-20 ·imaeil.com
  351. Iron Mountain Henrico campus ·first on record · stage Under construction ·2026-05-18 ·Richmond BizSense
  352. QTS Richmond 4 ·first on record · stage Planning approved ·2026-05-18 ·Richmond BizSense
  353. Digi Power X Columbiana data centre ·stage Energised ·2026-05-15 ·sec.gov
  354. TRON USA AI Campus ·stage Announced ·2026-05-15 ·readingeagle.com compute-atlas.com berksweekly.com
  355. Equinix KL2 ·first on record · stage Announced ·2026-05-12 ·Equinix DCD
  356. Metrobloks Martindale-Brightwood data centre ·condition Contestedcommunity opposition ·2026-05-12 ·wfyi.org
  357. Metrobloks Martindale-Brightwood data centre ·stage Planning approved ·2026-05-12 ·wfyi.org
  358. Empyrion Digital MY1 Johor campus ·stage Connection offered ·2026-05-07 ·DCD
  359. Krambu Bonner data centre ·first on record · stage Announced ·2026-05-07 ·DCD
  360. Serverfarm NVA Vienna Cloud ·first on record · stage Planning lodged ·2026-05-07 ·Serverfarm
  361. Tract Rosemount data centre ·first on record · stage Announced ·2026-05-07 ·DCD
  362. Beale Gardner data centre ·first on record · condition Cancelledwithdrawn by proponent ·2026-05-06 ·johnsoncountypost.com hppr.org
  363. IREN Sweetwater ·stage Energising ·2026-05-06 ·DCD
  364. Smithfield business complex with data centres ·condition Contestedcommunity opposition ·2026-05-05 ·oceanstatemedia.org
  365. Smithfield business complex with data centres ·first on record · stage Planning lodged ·2026-05-04 ·oceanstatemedia.org
  366. Stratos Project ·first on record · stage Planning approved ·2026-05-04 ·deseret.com boxeldercountyut.gov
  367. Kuching AI Data Campus ·first on record · stage Announced ·2026-05-02 ·The Star
  368. Amazon Calvert County data centre campus ·first on record · stage Planning lodged ·2026-05 ·calvertcountymd.gov calvertcountymd.gov
  369. Beale De Soto campus ·stage Planning approved ·2026-05 ·kcur.org
  370. LS Power Old Ridge Road campus ·first on record · condition Cancelledwithdrawn by proponent ·2026-05 ·Richmond BizSense compute-atlas.com
  371. Nottingham Business Park data centre ·first on record · condition Cancelledcommunity opposition ·2026-05 ·nhpr.org
  372. Prime PHX01 ·first on record · stage Under construction ·2026-05 ·dcmarketinsights.com
  373. Starpointe Business Park data centre campus ·first on record · stage Planning lodged ·2026-05 ·observer-reporter.com
  374. AirTrunk JHB3 and JHB4 ·first on record · stage Announced ·2026-04-30 ·dcatlas.io crnasia.com
  375. AirTrunk SYD4 ·first on record · condition Contestedcommunity opposition ·2026-04-30 ·Information Age (ACS)
  376. Dickson City Development data centres ·first on record · stage Planning lodged ·2026-04-30 ·thetimes-tribune.com thetimes-tribune.com
  377. Switch Beaver County campus ·first on record · stage Announced ·2026-04-30 ·Switch
  378. Project Raptor ·first on record · stage Announced ·2026-04-29 ·archercountynews.com
  379. Core Scientific Pecos ·first on record · stage Connection offered ·2026-04-28 ·DCD
  380. Keel Moses Lake campus ·first on record · milestone Decommissioned ·2026-04-28 ·Data Center Frontier
  381. Project Big Pine ·stage Connection applied ·2026-04-28 ·txktoday.com
  382. Project Big Pine ·first on record · stage Announced ·2026-04-28 ·txktoday.com DCD
  383. AirTrunk SYD2 extension ·first on record · stage Planning approved ·2026-04-27 ·NSW planning portal
  384. Project Hummingbird ·first on record · stage Announced ·2026-04-27 ·pittsburghmagazine.com
  385. Newton County Technology Park ·first on record · stage Planning lodged ·2026-04-22 ·GovTech DCD
  386. Armory Innovation District data centre ·stage Planning approved ·2026-04-21 ·stlmag.com
  387. DAMAC Digital Edgerton data centre ·first on record · stage Planning lodged ·2026-04-21 ·edgertonks.org
  388. JFE ·first on record · stage Announced ·2026-04-21 ·Shulman Advisory
  389. Meta Tulsa Data Center ·stage Announced ·2026-04-21 ·okcommerce.gov Meta
  390. Meta Tulsa Data Center ·first on record · stage Under construction ·2026-04-21 ·okcommerce.gov
  391. Nebo North data centre campus ·first on record · stage Planning approved ·2026-04-15 ·sltrib.com
  392. Aligned LBB-01 ·stage Under construction ·2026-04-09 ·Aligned
  393. Aligned LBB-01 ·first on record · stage Announced ·2026-04-09 ·Aligned coloprice.com
  394. Amazon Hinds County data centres ·first on record · stage Announced ·2026-04-09 ·Amazon
  395. Amazon Madison County data centre campus ·stage Under construction ·2026-04-09 ·Amazon
  396. CRG Festus data centre ·first on record · condition Contested ·2026-04-09 ·kbia.org
  397. Microsoft Gaines Charter Township datacenter ·first on record · stage Planning lodged ·2026-04-09 ·wwmt.com
  398. DataBank LAX2 ·first on record · stage Announced ·2026-04-08 ·datacentremagazine.com
  399. Hexa Builders Monroe Township data centre ·first on record · stage Planning lodged ·2026-04-08 ·newjerseymonitor.com woodburywarbler.com
  400. Imperial Data Center ·first on record · condition Contestedplanning approval ·2026-04-08 ·inewsource.org calmatters.org
  401. South Annville Township data centre ·first on record · stage Announced ·2026-04-08 ·lebtown.com
  402. Getworks Misawa-no-Mori AI Container Park ·stage Energised ·2026-04-07 ·cloud.watch.impress.co.jp
  403. Project Gold ·first on record · condition Contestedplanning approval ·2026-04-07 ·thetimes-tribune.com yahoo.com
  404. Project Sail ·first on record · stage Planning approved ·2026-04-07 ·fox5atlanta.com
  405. Hyperscale Data Dowagiac campus ·first on record · condition Contestedcommunity opposition ·2026-04-01 ·wwmt.com The Gander
  406. SoftBank Nara Ikoma Data Center ·first on record · milestone Ownership changed ·2026-04-01 ·idcf.jp
  407. Slate Belt Holdings campus ·first on record · stage Announced ·2026-04 ·tnonline.com
  408. Stargate Abilene ·first on record · stage Energising ·2026-04 ·Epoch AI
  409. Wagner Properties data centre ·first on record · stage Planning approved ·2026-04 ·compute-atlas.com Richmond BizSense
  410. xAI Colossus ·condition Paused ·2026-04 ·grokipedia.com
  411. Zerra DC Campbellfield ·first on record · stage Planning lodged ·2026-04 ·Zerra DC Information Age (ACS)
  412. Digital Edge OSA1 ·first on record · stage Announced ·2026-03-31 ·DCD
  413. NEXTDC S4 ·stage Under construction ·2026-03-31 ·Build Australia
  414. U-M and Los Alamos computing facility ·first on record · condition Contestedcommunity opposition ·2026-03-31 ·ypsitownship.org The Gander
  415. Prologis Trenton data centre ·first on record · stage Planning approved ·2026-03-30 ·stopohiodatacenters.org
  416. Crusoe Abilene second campus ·first on record · stage Announced ·2026-03-27 ·Crusoe
  417. Google Putnam County campus ·first on record · stage Announced ·2026-03-27 ·wvpublic.org
  418. Amazon Quantum Frederick site ·stage Planning approved ·2026-03-25 ·everydatacenter.com
  419. Google Botetourt County data centre ·first on record · stage Announced ·2026-03-25 ·botetourtva.gov botetourtva.gov
  420. Metrobloks Liberty data centre campus ·stage Announced ·2026-03-24 ·ded.mo.gov libertymissouri.gov
  421. Aedan Looking Glass Wanju data centre ·first on record · stage Announced ·2026-03-22 ·natlawreview.com
  422. PORTS Technology Campus ·first on record · stage Announced ·2026-03-20 ·broadbandbreakfast.com energy.gov sec.gov
  423. New Hill Digital Campus ·condition Cancelledwithdrawn by proponent ·2026-03-12 ·hoodline.com
  424. New Hill Digital Campus ·first on record · condition Contestedcommunity opposition ·2026-03-12 ·hoodline.com DCD
  425. Rockdale County data centre campus ·first on record · stage Planning lodged ·2026-03-12 ·rockdalecountyga.gov
  426. EdgeCore Mesa North Campus ·stage Planning approved ·2026-03-11 ·arizonaai.com datacenterrecord.org
  427. Naver Yongin data centre ·first on record · stage Announced ·2026-03-11 ·DCD
  428. Bedington Campus ·first on record · stage Announced ·2026-03-09 ·westvirginia.gov
  429. Atlas Development Temple data centre campus ·first on record · stage Planning lodged ·2026-03-07 ·times-georgian.com DCD
  430. Valara Holdings Spartanburg County data centre ·stage Planning lodged ·2026-03-04 ·des.sc.gov
  431. Core Scientific Hunt County ·stage Announced ·2026-03-02 ·sec.gov sec.gov
  432. Rowan Project Temple ·first on record · stage Under construction ·2026-03-02 ·interchange.puc.texas.gov
  433. EdgeConneX Kyotanabe ·first on record · stage Under construction ·2026-03 ·dcmarketinsights.com
  434. Green Data Socorro County ·first on record · stage Announced ·2026-03 ·States Newsroom
  435. Monarch Compute Campus ·first on record · milestone Ownership changed ·2026-03 ·sec.gov
  436. Project Delta ·condition Contestedplanning approval ·2026-03 ·Inside Climate News
  437. xAI Colossus ·stage Planning approved ·2026-03 ·grokipedia.com
  438. xAI Colossus ·stage Planning lodged ·2026-03 ·grokipedia.com
  439. Hassayampa Ranch Data Center ·first on record · condition Contestedcommunity opposition ·2026-02-28 ·maricopa.gov mcdot.maricopa.gov
  440. DC BLOX Atlanta East hyperscale campus ·first on record · stage Announced ·2026-02-26 ·DC BLOX
  441. DC BLOX Atlanta West hyperscale campus ·first on record · stage Announced ·2026-02-26 ·DC BLOX
  442. STACK Klickitat County data centre campus ·stage Announced ·2026-02-25 ·columbiariverkeeper.org goldendalesentinel.com
  443. Google Pine Island data centre ·first on record · stage Announced ·2026-02-24 ·blog.google
  444. Google Wilbarger County data centre ·stage Under construction ·2026-02-24 ·blog.google
  445. Google Wilbarger County data centre ·first on record · stage Announced ·2026-02-24 ·DCD blog.google
  446. Meta Kansas City Data Center ·first on record · stage Energised ·2026-02-23 ·kshb.com
  447. Skybox PowerCampus Texas ·first on record · stage Announced ·2026-02-19 ·Skybox Skybox
  448. STACK Benton campus ·first on record · stage Planning lodged ·2026-02-19 ·shreveportbossieradvocate.com
  449. Highlander SM One San Marcos campus ·condition Contested ·2026-02-17 ·austinchronicle.com
  450. Fort Meade data centre campus ·condition Contestedcommunity opposition ·2026-02-16 ·wusf.org globaldatacenters.net
  451. Project Ruby ·first on record · stage Announced ·2026-02-16 ·wtvm.com
  452. Google Kansas City data centre ·first on record · stage Announced ·2026-02-13 ·kshb.com Google
  453. Skybox Round Rock ·first on record · stage Planning approved ·2026-02-12 ·austinchronicle.com
  454. Meta Lebanon Data Center ·first on record · stage Under construction ·2026-02-11 ·lebanon.in.gov
  455. Incheon Airport Aviation AI Innovation Hub data centre ·first on record · stage Announced ·2026-02-10 ·etoday.co.kr
  456. Bridge Data Centres Banting campus ·first on record · stage Announced ·2026-02-06 ·DCD
  457. AIMS Cyberjaya 200MW AI data centre ·stage Announced ·2026-02-05 ·digitalnewsasia.com DCD
  458. Pumpkin Center ·first on record · stage Planning approved ·2026-02-03 ·wrdw.com
  459. SGC Energy Gunsan AI Data Center ·first on record · stage Announced ·2026-02-03 ·mk.co.kr Asia Economy
  460. TeraWulf Justified Data ·first on record · milestone Ownership changed ·2026-02-02 ·sec.gov
  461. Benthaus Texarkana AI campus ·first on record · stage Announced ·2026-02 ·texarkanagazette.com theenergymag.com
  462. CyrusOne Freestone County Data Center ·first on record · stage Announced ·2026-02 ·sec.gov sec.gov sec.gov CyrusOne sec.gov
  463. IREN Oklahoma campus ·first on record · stage Announced ·2026-02 ·affordablesolar.io IREN
  464. STT GDC STT Johor 1 campus ·milestone Ownership changed ·2026-02 ·DCD
  465. xAI Colossus ·first on record · condition Contestedcommunity opposition ·2026-02 ·grokipedia.com
  466. AI Tech Tomakomai data centre ·stage Announced ·2026-01-30 ·prtimes.jp nikkei.com
  467. Geumgang Cheonan Jiksan AI data centre ·stage Connection offered ·2026-01-29 ·khan.co.kr
  468. Geumgang Cheonan Jiksan AI data centre ·first on record · stage Announced ·2026-01-29 ·khan.co.kr
  469. OPTAGE Sonezaki Data Center ·first on record · stage Energised ·2026-01-29 ·optage.co.jp
  470. SC Zeus OSA1 ·stage Connection offered ·2026-01-29 ·kansai-sanpo.com
  471. Ubitus Maizuru City AI Data Center ·first on record · stage Announced ·2026-01-29 ·ubitus.ai
  472. Crooked Creek data centre ·stage Planning lodged ·2026-01-28 ·stlmag.com
  473. K Square Data Center Uijeongbu ·stage Planning approved ·2026-01-28 ·hankyung.com
  474. K Square Data Center Uijeongbu ·stage Connection offered ·2026-01-28 ·hankyung.com
  475. K Square Data Center Uijeongbu ·first on record · stage Announced ·2026-01-28 ·hankyung.com en.sedaily.com en.etnews.com
  476. Microsoft Mount Pleasant datacenter campus ·first on record · stage Planning approved ·2026-01-28 ·wpr.org
  477. Namyangju Maseok X-AI Smart Energy Data Centre ·first on record · stage Announced ·2026-01-28 ·en.sedaily.com telecompaper.com
  478. Crooked Creek data centre ·first on record · stage Announced ·2026-01-27 ·stlmag.com
  479. Nexus Yang Green Data Centre campus ·first on record · stage Under construction ·2026-01-27 ·mcigroup.my bernama.com
  480. TigerDC Project Spero ·first on record · stage Announced ·2026-01-26 ·postandcourier.com DCD
  481. KDDI Osaka Sakai AI Data Center ·first on record · stage Energised ·2026-01-22 ·DCD Mingtiandi
  482. Yeouido urban edge AI data centre ·first on record · stage Announced ·2026-01-22 ·DCD hellot.net
  483. Karis Critical Naperville data centre ·first on record · condition Contestedcommunity opposition ·2026-01-21 ·dailyherald.com
  484. NEXTDC M4 ·first on record · stage Planning approved ·2026-01-21 ·The Urban Developer
  485. Lacy Lakeview Data District ·first on record · stage Announced ·2026-01-20 ·ptc.org DCD
  486. Armory Innovation District data centre ·first on record · stage Announced ·2026-01-16 ·stlpr.org
  487. Benefos Gangjin AI data centre ·first on record · stage Announced ·2026-01-16 ·hankyung.com Asia Economy
  488. Benefos Jangseong AI data centre ·first on record · stage Announced ·2026-01-16 ·hankyung.com
  489. TenKey Franklin data centre ·first on record · stage Planning lodged ·2026-01-16 ·wbko.com
  490. Galaxy Helios campus ·stage Connection offered ·2026-01-15 ·sec.gov
  491. Soluna Project Kati 2 ·first on record · stage Announced ·2026-01-15 ·sec.gov sec.gov
  492. CleanSpark Brazoria County ·first on record · stage Announced ·2026-01-14 ·compute-atlas.com stocktitan.net theenergymag.com
  493. Incheon Guwol AI Hub Centre ·first on record · stage Announced ·2026-01-14 ·hankyung.com
  494. Kakao data centre at SNU Siheung Campus ·first on record · condition Cancelledcommunity opposition ·2026-01-13 ·kyeongin.com
  495. Novva Tahoe Reno ·stage Announced ·2026-01-13 ·Novva
  496. Tract Caldwell Valley Technology Park ·first on record · milestone Ownership changed ·2026-01-13 ·Tract
  497. AVAIO Project Leo ·first on record · stage Announced ·2026-01-12 ·avaiodigital.com avaiodigital.com
  498. TM Nxera Johor campus ·stage Connection offered ·2026-01-12 ·The Star
  499. 5C Springfield data centre ·first on record · milestone Ownership changed ·2026-01-09 ·wyso.org
  500. KEPCO KDN Solaseado energy-specialised AI data centre ·first on record · stage Announced ·2026-01-08 ·fnnews.com
  501. xAI MACROHARDRR data centre ·first on record · stage Announced ·2026-01-08 ·governorreeves.ms.gov
  502. Beale Infrastructure Marana data centre campus ·stage Planning approved ·2026-01-06 ·azfamily.com azpm.org
  503. RadiusDC Plainfield ·first on record · stage Planning approved ·2026-01-06 ·wrtv.com constructionreviewonline.com
  504. Samsung SDS Gumi AI Data Center ·first on record · stage Announced ·2026-01-02 ·gumi.go.kr biz.heraldcorp.com
  505. Amazon Sidney data centre ·first on record · stage Under construction ·2026-01 ·stopohiodatacenters.org
  506. Hillwood Spalding County data centre ·first on record · stage Planning lodged ·2026-01 ·Bisnow
  507. Pekin data centre proposal ·first on record · condition Contestedcommunity opposition ·2026-01 ·constructionreviewonline.com
  508. Project Delta ·first on record · stage Planning approved ·2026-01 ·Inside Climate News
  509. Riot Rockdale site ·milestone Ownership changed ·2026-01 ·sec.gov sec.gov Riot Platforms
  510. Texas Solarworks Lubbock hyperscale data centre and solar ·first on record · condition Contestedcommunity opposition ·2026-01 ·hppr.org
  511. Cloverleaf Carlton data centre ·first on record · condition Cancelledcommunity opposition ·2025-12-31 ·wisconsinwatch.org
  512. Compass Meridian campus ·first on record · stage Under construction ·2025-12-31 ·Compass
  513. Delta Gigasite ·stage Under construction ·2025-12-31 ·business.utah.gov creekstone.energy
  514. Edged Council Bluffs ·first on record · stage Planning approved ·2025-12-31 ·nearbydatacenters.org
  515. Fort Meade data centre campus ·first on record · stage Planning approved ·2025-12-31 ·globaldatacenters.net wusf.org
  516. GigaStream Toyama ·first on record · stage Announced ·2025-12-31 ·DCD
  517. Google Morgan County data centre ·first on record · stage Announced ·2025-12-31 ·Google
  518. Keel Panther Creek campus ·first on record · milestone Ownership changed ·2025-12-31 ·DCD
  519. Meta Mesa Data Center ·stage Energised ·2025-12-31 ·Meta
  520. Metrobloks Martindale-Brightwood data centre ·first on record · stage Planning lodged ·2025-12-31 ·wfyi.org wfyi.org
  521. Mountain Road Technology Park ·first on record · stage Planning lodged ·2025-12-31 ·Richmond BizSense hanovercounty.gov
  522. Perri Melbourne Data Centre ·first on record · stage Planning approved ·2025-12-31 ·ABC News SBS News newsfinale.com
  523. SK Suseong Alpha City AI data centre ·condition Cancelled ·2025-12-31 ·hankyung.com
  524. Skybox second campus west of Hutto Megasite ·first on record · stage Planning lodged ·2025-12-31 ·hellogeorgetown.com
  525. Stargate Michigan ·stage Announced ·2025-12-31 ·cnbc.com
  526. Stargate Michigan ·first on record · stage Connection offered ·2025-12-31 ·sec.gov
  527. Warrenton Group Petersburg campus ·first on record · stage Planning approved ·2025-12-31 ·Richmond BizSense
  528. DigiCo SYD1 expansion ·stage Planning approved ·2025-12-28 ·capitalbrief.com
  529. TEPCO Kashiwazaki-Kariwa data centre ·first on record · stage Announced ·2025-12-22 ·nikkei.com
  530. Texas Critical Data Centers ·milestone Ownership changed ·2025-12-19 ·sec.gov
  531. AirTrunk OSK2 ·first on record · stage Announced ·2025-12-17 ·cafe-dc.com
  532. Cetronia Road Data Center ·first on record · stage Planning lodged ·2025-12-17 ·lehighvalleypublicmedia.org
  533. Google Van Buren Township data centre ·first on record · stage Connection offered ·2025-12-17 ·sec.gov
  534. Crusoe Springfield data centre ·first on record · stage Announced ·2025-12-16 ·yahoo.com
  535. Entrata Data Center ·first on record · stage Planning lodged ·2025-12-16 ·azbex.com mahometdaily.com
  536. Jangseong Pine Data Center ·first on record · stage Under construction ·2025-12-15 ·twig24.com Asia Economy theinvestor.co.kr
  537. Metrobloks Liberty data centre campus ·first on record · stage Planning approved ·2025-12-15 ·libertymissouri.gov
  538. Price Road Innovation Campus ·first on record · condition Contestedcommunity opposition ·2025-12-12 ·eenews.net
  539. Pittsburg Data Hub ·stage Planning approved ·2025-12-11 ·ceqanet.lci.ca.gov files.ceqanet.lci.ca.gov files.ceqanet.lci.ca.gov
  540. Vantage Port Washington ·first on record · stage Planning approved ·2025-12-11 ·dnr.wisconsin.gov
  541. Empyrion Digital MY1 Johor campus ·first on record · stage Announced ·2025-12-09 ·DCD
  542. NEXTDC TK1 Tokyo ·first on record · stage Under construction ·2025-12-08 ·datacentremagazine.com
  543. Solis Arx Progress Park data centre ·first on record · stage Announced ·2025-12-05 ·wytheco.org Cardinal News
  544. GNC Energy Dangjin Seokmun AI data centre ·first on record · stage Announced ·2025-12-04 ·heraldk.com
  545. Springdale data centre ·stage Announced ·2025-12-03 ·GovTech
  546. NTT Gainesville campus ·milestone Ownership changed ·2025-12-02 ·princewilliamtimes.com
  547. Atlas Agro Benton County data centre campus ·first on record · stage Announced ·2025-12 ·isadatacentercoming.com
  548. Monarch Data Center ·first on record · stage Planning approved ·2025-12 ·fernleyreporter.com
  549. NEXTDC S4 ·first on record · stage Planning approvedautomated ·2025-12 ·NXT: 2026 AGM Presentation
  550. SC Zeus OSA1 ·first on record · stage Under construction ·2025-12 ·kansai-sanpo.com sccpasia.com
  551. Stillwater Lovejoy data centre campus ·first on record · stage Planning lodged ·2025-12 ·DCD usdatacenterprojects.com
  552. White Clay Creek Business Park data centre ·first on record · stage Planning lodged ·2025-12 ·suedatacenters.org newarkpostonline.com
  553. Google Armstrong County data centre ·stage Announced ·2025-11-25 ·abc7amarillo.com
  554. Meta Bowling Green Data Center ·stage Under construction ·2025-11-24 ·jobsohio.com
  555. 43-61 Turner Road Data Centre ·first on record · stage Planning approved ·2025-11-21 ·NSW planning portal
  556. Amazon Warren County data centre campus ·first on record · stage Announced ·2025-11-20 ·Amazon
  557. CleanArc VA1 ·first on record · stage Under construction ·2025-11-20 ·cleanarcdatacenters.com
  558. Google Muskogee County data centre ·first on record · stage Announced ·2025-11-20 ·ktul.com
  559. Rocklocker Kalkaska County data centre ·first on record · condition Cancelledcommunity opposition ·2025-11-20 ·9and10news.com DCD The Gander
  560. ESR KR1 Bupyeong ·first on record · stage Announced ·2025-11-18 ·Mingtiandi
  561. Woongcheon AI Campus Boryeong data centre ·first on record · stage Announced ·2025-11-18 ·khan.co.kr breaknews.com
  562. 900 Conshohocken Road data centre campus ·first on record · condition Cancelledwithdrawn by proponent ·2025-11-17 ·DCD
  563. Oppidan North Mankato data centre ·first on record · condition Pausedplanning approval ·2025-11-17 ·mankatofreepress.com
  564. Constellation East Coventry data centre ·first on record · stage Planning lodged ·2025-11-13 ·suburbanrealtorsalliance.com DCD
  565. Starwood Doma Minchinbury ·first on record · stage Planning approved ·2025-11-13 ·PR Newswire FNArena Mingtiandi
  566. Tarboro DC ·first on record · condition Contestedplanning approval ·2025-11-13 ·DCD DCD
  567. DigiCo BNE3 Brisbane Airport ·stage Announced ·2025-11-12 ·announcements.asx.com.au
  568. Atlas Compute Campus ·first on record · stage Announced ·2025-11-06 ·thetechoutlook.com
  569. DCI Poplars Data Centre ·stage Planning approved ·2025-11-06 ·NSW planning portal
  570. New Era Lea County AI hub ·first on record · stage Announced ·2025-11-06 ·abqjournal.com
  571. KT Cloud Gasan AI Data Center ·stage Energised ·2025-11-05 ·ajunews.com
  572. Tract Cannon Falls Technology Park ·first on record · stage Planning approved ·2025-11-05 ·eqb.state.mn.us
  573. Microsoft Caledonia data centre ·condition Cancelledcommunity opposition ·2025-11-03 ·tmj4.com
  574. Microsoft Caledonia data centre ·first on record · condition Contestedcommunity opposition ·2025-11-03 ·tmj4.com
  575. Spalding Investments data centre campus ·condition Contestedcommunity opposition ·2025-11-01 ·griffindailynews.com
  576. Spalding Investments data centre campus ·first on record · stage Planning approved ·2025-11-01 ·griffindailynews.com
  577. AI Tech Tomakomai data centre ·first on record · stage Under construction ·2025-11 ·prtimes.jp
  578. Forsyth data centre campus ·first on record · stage Planning lodged ·2025-11 ·DCD
  579. Google Project Skye ·stage Planning lodged ·2025-11 ·chesterfieldreport.com
  580. Homer City Energy Campus ·stage Planning approved ·2025-11 ·technical.ly pa.gov
  581. NuVu Petersburg campus ·milestone Ownership changed ·2025-11 ·Richmond BizSense
  582. Oppidan Hampton data centre ·first on record · condition Pausedplanning approval ·2025-11 ·twincities.com blandinonbroadband.org
  583. QTS Blakely ·first on record · stage Announced ·2025-11 ·DCD
  584. Vantage JHB1 ·milestone Ownership changed ·2025-11 ·coloprice.com getcommercialproperty.com
  585. Constant Company Springfield data centre ·first on record · stage Announced ·2025-10-30 ·springfieldnewssun.com
  586. Franklin Partners Pavilion Township data centre ·condition Pausedcommunity opposition ·2025-10-30 ·wwmt.com
  587. Franklin Partners Pavilion Township data centre ·first on record · condition Contestedcommunity opposition ·2025-10-30 ·wwmt.com
  588. CleanSpark Austin County ·stage Connection offered ·2025-10-29 ·sec.gov sec.gov
  589. CleanSpark Austin County ·first on record · stage Announced ·2025-10-29 ·sec.gov sec.gov sec.gov
  590. Lambda Kansas City AI factory ·first on record · stage Announced ·2025-10-28 ·ded.mo.gov missouribusinessalert.com
  591. Jurong Island Low-Carbon Data Centre Park ·first on record · stage Announced ·2025-10-27 ·jtc.gov.sg
  592. Rexroth Farms data centre ·condition Contestedcommunity opposition ·2025-10-27 ·noconshydatacenters.com
  593. Rexroth Farms data centre ·first on record · stage Planning lodged ·2025-10-27 ·compute-atlas.com keystonenewsroom.com
  594. Archbald I campus north of Staback Park ·first on record · stage Planning lodged ·2025-10-22 ·suedatacenters.org thetimes-tribune.com
  595. Yeongdeungpo-dong 2-ga edge data centre ·stage Announced ·2025-10-17 ·biz.chosun.com
  596. ESR-Colt Minoh campus ·first on record · stage Announced ·2025-10-16 ·coltdatacentres.net esr.com Mingtiandi
  597. Project Horizon ·first on record · stage Announced ·2025-10-15 ·publicpower.org
  598. Project Horizon ·first on record · stage Announced ·2025-10-15 ·publicpower.org Data Center Frontier
  599. Amazon Salem Township campus ·stage Under construction ·2025-10-10 ·citizensvoice.com
  600. Pittsburg Data Hub ·first on record · stage Planning lodged ·2025-10-10 ·files.ceqanet.lci.ca.gov
  601. Klondike data centre ·stage Planning approved ·2025-10-09 ·files.dep.state.pa.us compute-atlas.com
  602. Project Accelerate ·first on record · condition Cancelledwithdrawn by proponent ·2025-10-07 ·DCD
  603. JERA Yokohama thermal power station data centre ·first on record · stage Announced ·2025-10-03 ·jera.co.jp insurance-edge.net
  604. NTT GDC Osaka North 1 ·stage Under construction ·2025-10-01 ·Mingtiandi
  605. Applied Digital Polaris Forge 1 ·first on record · stage Energised ·2025-10 ·Applied Digital
  606. Beale Infrastructure Marana data centre campus ·first on record · stage Planning lodged ·2025-10 ·azfamily.com
  607. Getworks Misawa-no-Mori AI Container Park ·stage Under construction ·2025-10 ·cafe-dc.com
  608. Getworks Misawa-no-Mori AI Container Park ·first on record · stage Announced ·2025-10 ·cafe-dc.com
  609. Highlander SM One San Marcos campus ·condition Cancelledplanning approval ·2025-10 ·DCD
  610. Nscale Ward County ·first on record · stage Announced ·2025-10 ·sec.gov
  611. Related Digital Cheyenne Campus ·first on record · stage Under construction ·2025-10 ·Blackridge Research related.com related-digital.com
  612. TeraWulf Abernathy joint venture ·first on record · stage Announced ·2025-10 ·sec.gov sec.gov sec.gov TeraWulf DCD
  613. Baram DeepTech green data centre park ·first on record · stage Announced ·2025-09-26 ·quiverquant.com reglobal.org
  614. Digital Edge TYO7 ·stage Energised ·2025-09-25 ·cafe-dc.com
  615. Warburg Pincus ·first on record · stage Announced ·2025-09-25 ·DCD Mingtiandi
  616. DCI SYD01 Eastern Creek ·first on record · stage Planning approved ·2025-09-24 ·NSW planning portal
  617. DCI SYD02/SYD03 Eastern Creek expansion ·first on record · stage Planning approved ·2025-09-24 ·NSW planning portal
  618. Equinix Minooka data centre ·first on record · stage Planning approved ·2025-09-23 ·datacenterwatch.info
  619. Stargate Doña Ana County ·first on record · stage Announced ·2025-09-23 ·OpenAI
  620. Amazon Hilliard Scioto Darby Creek Road campus ·first on record · stage Planning approved ·2025-09-22 ·hilliardohio.gov compute-atlas.com
  621. Google Haskell County data centre ·first on record · stage Under construction ·2025-09-19 ·intersect.com
  622. CDC Maddington Campus ·stage Announced ·2025-09-18 ·announcements.asx.com.au
  623. Pier DC ·milestone Renamed ·2025-09-18 ·announcements.asx.com.au
  624. Pine Ridge Technology Park ·first on record · stage Planning approved ·2025-09-18 ·route-fifty.com twiggsdatacenterwatch.com
  625. Valara Holdings Spartanburg County data centre ·first on record · stage Planning approved ·2025-09-17 ·des.sc.gov
  626. Archer Faribault data centre ·stage Planning approved ·2025-09-11 ·archerdatacenters.com
  627. Penn Forest data centre site ·first on record · stage Announced ·2025-09-11 ·tnonline.com penncapital-star.com
  628. Avaio Digital Taurus ·first on record · stage Under construction ·2025-09-10 ·avaiodigital.com
  629. CDC Maddington Campus ·first on record · stage Planning lodged ·2025-09-04 ·planning.wa.gov.au
  630. Flexential Portland - Hillsboro 6 ·first on record · stage Announced ·2025-09-04 ·Flexential
  631. RadiusDC Nashville I ·stage Under construction ·2025-09-04 ·DCD
  632. Archer Faribault data centre ·first on record · condition Contested ·2025-09 ·mncenter.org
  633. CoreSite NY2 and NY3 ·first on record · milestone Expanded ·2025-09 ·metrocoloadvisory.com
  634. Galaxy Helios campus ·first on record · stage Under construction ·2025-09 ·sec.gov
  635. Yeongdeungpo-dong 2-ga edge data centre ·first on record · stage Under construction ·2025-09 ·brunch.co.kr biz.chosun.com
  636. Google Prince William County data centre ·first on record · stage Planning lodged ·2025-08-29 ·princewilliamtimes.com
  637. Koramco Busan Jangnim-dong DC ·stage Connection offered ·2025-08-29 ·Asia Economy
  638. Koramco Busan Jangnim-dong DC ·first on record · stage Announced ·2025-08-29 ·Asia Economy mk.co.kr
  639. Google Chesterfield County data centre ·first on record · stage Under construction ·2025-08-28 ·chesterfield.gov
  640. Roxbury Technology Park ·condition Contestedcommunity opposition ·2025-08-22 ·Richmond BizSense
  641. Roxbury Technology Park ·stage Planning lodged ·2025-08-22 ·Richmond BizSense DCD diodeventures.com
  642. Google Franklin Township data centre ·stage Planning approved ·2025-08-20 ·DCD
  643. CRG St. Charles data centre ·first on record · condition Contestedcommunity opposition ·2025-08-19 ·GovTech
  644. Vantage Shackelford County ·first on record · stage Announced ·2025-08-19 ·telborg.com
  645. Applied Digital Polaris Forge 2 ·stage Announced ·2025-08-18 ·sec.gov Applied Digital
  646. Applied Digital Polaris Forge 2 ·first on record · stage Under construction ·2025-08-18 ·sec.gov
  647. DigiCo BNE3 Brisbane Airport ·first on record · milestone Renamed ·2025-08-18 ·announcements.asx.com.au
  648. Roxbury Technology Park ·first on record · condition Cancelledwithdrawn by proponent ·2025-08-18 ·diodeventures.com Richmond BizSense
  649. Yondr Dallas campus ·first on record · stage Announced ·2025-08-18 ·Yondr
  650. AirTrunk SGP2 ·first on record · stage Announced ·2025-08-17 ·AirTrunk
  651. Sunnyside Road data centre ·first on record · stage Planning lodged ·2025-08-13 ·globaldatacenters.net yahoo.com
  652. Digital Power Optimization Wisconsin Rapids AI computing plant ·first on record · condition Cancelledwithdrawn by proponent ·2025-08-07 ·badgerinstitute.org
  653. Beale De Soto campus ·first on record · stage Announced ·2025-08 ·kcur.org bealeinfra.com
  654. GW Ranch ·first on record · stage Announced ·2025-08 ·energytech.com
  655. Hunting Hawk Technology Park ·first on record · stage Planning lodged ·2025-08 ·Richmond BizSense DCD
  656. Jangseong Geondong Mine data centre ·first on record · stage Announced ·2025-08 ·newsasia.kr
  657. Lakeville data centre ·first on record · condition Contestedplanning approval ·2025-08 ·mncenter.org
  658. Mooresville Technology Park ·first on record · stage Announced ·2025-08 ·DCD
  659. Project Blue ·first on record · condition Cancelled ·2025-08 ·kold.com
  660. Springdale data centre ·first on record · stage Planning lodged ·2025-08 ·GovTech
  661. Zenith Volts Roswell data centre ·first on record · stage Planning approved ·2025-08 ·servercountry.org prnewswire.com
  662. Big Sky Digital Infrastructure ·first on record · stage Announced ·2025-07-30 ·sec.gov
  663. Delta Gigasite ·stage Announced ·2025-07-29 ·sec.gov
  664. FLOW Digital TK7 campus ·first on record · stage Under construction ·2025-07-29 ·flowdigital.com
  665. Amazon third Louisa County campus ·first on record · condition Cancelledcommunity opposition ·2025-07-23 ·siteselection.com
  666. Vantage Reno ·first on record · stage Announced ·2025-07-16 ·DCD connectcre.com
  667. CoreWeave Lancaster data centre ·first on record · stage Announced ·2025-07-15 ·DCD CoreWeave
  668. Great Oaks South Data Center ·stage Planning approved ·2025-07-14 ·files.ceqanet.lci.ca.gov
  669. Chirisa Technology Park CTP-01 ·first on record · stage Energised ·2025-07-09 ·chirisatechnologyparks.com
  670. Amazon Gilroy data centre ·first on record · stage Planning approved ·2025-07-03 ·ceqanet.lci.ca.gov
  671. CyrusOne Bosque County Data Center ·stage Announced ·2025-07 ·DCD CyrusOne sec.gov
  672. DayOne SG1 ·first on record · stage Under construction ·2025-07 ·ocbc.com
  673. East Fishkill data centre ·first on record · stage Connection applied ·2025-07 ·servercountry.org
  674. NorthTown Data Center ·first on record · stage Planning lodged ·2025-06-30 ·California Energy Commission
  675. UEM Sunrise and Logos Gerbang Nusajaya campus ·first on record · condition Cancelledwithdrawn by proponent ·2025-06-25 ·Free Malaysia Today
  676. Cielo Gaffney data centre campus ·first on record · stage Announced ·2025-06-24 ·governor.sc.gov scdailygazette.com DCD
  677. EdgeCore Louisa County ·first on record · stage Announced ·2025-06-24 ·DCD
  678. IGIS Myeongji-Noksan AI data centres ·first on record · stage Announced ·2025-06-17 ·busan.go.kr
  679. TAC Data Centers Great Falls campus ·first on record · stage Announced ·2025-06-17 ·montanaindependent.substack.com
  680. Breaker Street data centre campus ·first on record · stage Planning lodged ·2025-06-11 ·thetimes-tribune.com thetimes-tribune.com yahoo.com
  681. Telehouse TOKYO Tama 5-2nd ·first on record · stage Under construction ·2025-06-11 ·businessnetwork.jp biz.kddi.com cloud.watch.impress.co.jp
  682. Colt Tokyo Yoshikawa ·first on record · stage Announced ·2025-06-10 ·coltdatacentres.net
  683. Delta Gigasite ·first on record · stage Planning approved ·2025-06-05 ·creekstone.energy ksl.com
  684. Amazon Richmond County data centre campus ·first on record · stage Announced ·2025-06 ·Amazon richmondnced.com DCD
  685. Amazon Salem Township campus ·first on record · stage Announced ·2025-06 ·citizensvoice.com
  686. Bells Ferry Road data centre campus ·first on record · stage Planning approved ·2025-06 ·DCD
  687. Cologix Delaware County data centre ·first on record · stage Under construction ·2025-06 ·delawaresource.com
  688. CoreWeave Kenilworth NEST 11 ·first on record · stage Announced ·2025-06 ·sec.gov
  689. Google Armstrong County data centre ·first on record · stage Under construction ·2025-06 ·Crusoe
  690. Hut 8 River Bend ·stage Under construction ·2025-06 ·compute-atlas.com opportunitylouisiana.gov sec.gov
  691. Kakao second data centre Namyangju ·first on record · stage Announced ·2025-06 ·ggc.go.kr
  692. Matrix Data Center Campus ·first on record · stage Under construction ·2025-06 ·msbglobalservices.com ktbb.com
  693. NEXTDC SC2 Sunshine Coast ·stage Planning approved ·2025-06 ·sunshinecoastnews.com.au
  694. Vantage JHB1 ·first on record · stage Energised ·2025-06 ·coloprice.com
  695. Amazon Becker data centre ·first on record · condition Paused ·2025-05-23 ·mprnews.org fox9.com
  696. STACK SVY03A Data Center Campus ·stage Planning approved ·2025-05-22 ·hayward-ca.gov
  697. SK Broadband Pangyo Data Center ·first on record · milestone Ownership changed ·2025-05-16 ·DCD
  698. Project Matador ·first on record · stage Announced ·2025-05-14 ·sec.gov
  699. Chesapeake Great Bridge data centre ·stage Planning lodged ·2025-05-13 ·whro.org
  700. Edged Des Moines ·stage Under construction ·2025-05-06 ·Edged
  701. Google Lincoln data centre ·stage Connection offered ·2025-05-05 ·1011now.com
  702. Amazon Web Services South Bend data centre campus ·first on record · stage Announced ·2025-05-02 ·Amazon
  703. Digital Edge SEL3 ·first on record · stage Under construction ·2025-05 ·aap.com.au
  704. Digital Halo JHB1 ·first on record · milestone Ownership changed ·2025-05 ·DCD
  705. Google Project Skye ·first on record · stage Planning approved ·2025-05 ·chesterfieldreport.com
  706. Google Watkins Centre South ·stage Planning approved ·2025-05 ·chesterfield.gov
  707. IBK Hanam Data Center ·first on record · stage Energised ·2025-05 ·zdnet.co.kr
  708. NTT GDC Osaka North 1 ·first on record · stage Announced ·2025-05 ·Mingtiandi
  709. NuVu Petersburg campus ·first on record · stage Planning lodged ·2025-05 ·Richmond BizSense
  710. EdgeConneX Cyberjaya campus ·first on record · stage Announced ·2025-04-24 ·Tech Wire Asia
  711. Princeton Digital Group TY1 ·stage Energised ·2025-04-24 ·dcatlas.io
  712. Balico Pittsylvania data centre campus ·condition Contestedcommunity opposition ·2025-04-22 ·Cardinal News
  713. NEXTDC S6 Sydney ·first on record · stage Energised ·2025-04-16 ·nextdc.com
  714. Project Peach ·stage Planning approved ·2025-04-15 ·nearbydatacenters.org
  715. SoftBank Tomakomai AI Data Center ·first on record · stage Under construction ·2025-04-15 ·safeguard.sh softbank.jp
  716. Meta Bowling Green Data Center ·first on record · stage Announced ·2025-04-09 ·jobsohio.com
  717. Balico Pittsylvania data centre campus ·condition Cancelledwithdrawn by proponent ·2025-04-07 ·Cardinal News Cardinal News
  718. Homer City Energy Campus ·stage Planning lodged ·2025-04-04 ·pa.gov
  719. Homer City Energy Campus ·stage Announced ·2025-04-02 ·homercityredevelopment.com
  720. 5C MEM01 ·first on record · stage Planning approved ·2025-04 ·Data Center Frontier
  721. Archbald Data & Energy Center ·first on record · stage Planning lodged ·2025-04 ·DCD yahoo.com
  722. Digital Realty Moores Chapel campus ·first on record · stage Planning lodged ·2025-04 ·DCD
  723. Google Little Rock data centre ·first on record · stage Announced ·2025-04 ·States Newsroom
  724. Hayden Technologies data centre ·first on record · stage Energised ·2025-04 ·datacenter.fyi
  725. Project Gravity ·stage Planning lodged ·2025-04 ·yahoo.com
  726. Savannah River Site AI data centre ·first on record · stage Announced ·2025-04 ·energy.gov DCD
  727. Vantage Pittsboro data centre ·condition Contestedcommunity opposition ·2025-04 ·nearbydatacenters.org
  728. Project Spalding ·first on record · stage Planning lodged ·2025-03-31 ·datacentercensus.com
  729. KT Cloud Gaebong data centre ·condition Contestedcommunity opposition ·2025-03-30 ·biz.chosun.com
  730. Cochran Tech Park ·first on record · stage Planning lodged ·2025-03-27 ·datacentersnearyou.org
  731. Okestro Cloud Sejong data centre ·first on record · stage Announced ·2025-03-25 ·ddaily.co.kr DCD Mingtiandi
  732. STACK Elk Grove Village 36 MW data centre ·first on record · stage Announced ·2025-03-25 ·STACK Infrastructure
  733. Data City Texas ·first on record · stage Announced ·2025-03-24 ·Bisnow
  734. Goodman Project Mars ·first on record · stage Planning lodged ·2025-03-18 ·NSW planning portal DCD In the Cove
  735. NEXTDC SC2 Sunshine Coast ·first on record · stage Planning lodged ·2025-03-18 ·yourneighbourhood.com.au
  736. Vantage Pittsboro data centre ·first on record · stage Planning approved ·2025-03-18 ·nearbydatacenters.org
  737. Ansan Choji-dong data centre ·stage Announced ·2025-03-12 ·mk.co.kr
  738. Google Stillwater data centre ·first on record · stage Announced ·2025-03-12 ·DCD
  739. RadiusDC Nashville I ·first on record · stage Announced ·2025-03-06 ·radius-dc.com DCD
  740. Edged Des Moines ·first on record · stage Announced ·2025-03-04 ·Edged
  741. Google Franklin Township data centre ·first on record · stage Planning lodged ·2025-03 ·DCD
  742. Highlander SM One San Marcos campus ·first on record · stage Planning lodged ·2025-03 ·DCD centexdatacenters.org
  743. Iron Horse data centre campus ·first on record · stage Planning lodged ·2025-03 ·Richmond BizSense Richmond BizSense Richmond BizSense
  744. JB Financial Group data centre ·first on record · stage Announced ·2025-03 ·jjan.kr
  745. Ridgeline data centre and microgrid ·first on record · stage Planning lodged ·2025-03 ·westvirginiawatch.com
  746. Texas Critical Data Centers ·first on record · stage Announced ·2025-02-27 ·sec.gov sec.gov
  747. AWS Incheon Gajwa Tech Centre ·stage Under construction ·2025-02-24 ·mk.co.kr
  748. Dohwa Data Centre ·stage Connection offered ·2025-02-19 ·dealbook.co.kr
  749. DC BLOX Richmond ·condition Contestedcommunity opposition ·2025-02-18 ·Richmond BizSense
  750. DC BLOX Richmond ·first on record · stage Planning lodged ·2025-02-18 ·Richmond BizSense
  751. AirTrunk JHB2 ·first on record · stage Announced ·2025-02-17 ·AirTrunk mida.gov.my crnasia.com
  752. Wilderness Crossing data centre complex ·condition Contested ·2025-02-13 ·Piedmont Environmental Council States Newsroom
  753. Digi Power X Columbiana data centre ·first on record · stage Announced ·2025-02-11 ·sec.gov accessnewswire.com
  754. STACK NVA05C ·stage Planning lodged ·2025-02-11 ·Potomac Local
  755. CapitaLand Investment Osaka DC ·first on record · stage Announced ·2025-02-04 ·capitaland.com Mingtiandi
  756. STACK NVA05C ·first on record · stage Planning approved ·2025-02-04 ·Potomac Local
  757. CDC Laverton ·first on record · stage Under construction ·2025-02 ·Baxtel itkservices3.com
  758. Core Scientific Auburn ·first on record · stage Announced ·2025-02 ·compute-atlas.com Core Scientific
  759. Fir Hills ·first on record · stage Announced ·2025-02 ·clik.nanet.go.kr
  760. Google Watkins Centre South ·first on record · stage Planning lodged ·2025-02 ·DCD
  761. Iron Mountain MIA-1 ·first on record · stage Under construction ·2025-02 ·DCD
  762. KT Cloud Gaebong data centre ·stage Under construction ·2025-02 ·biz.chosun.com
  763. STT GDC STT Johor 1 campus ·first on record · stage Under construction ·2025-02 ·Baxtel DCD mida.gov.my mida.gov.my mida.gov.my ciosea.economictimes.indiatimes.com
  764. Tract Chesterfield campus ·first on record · stage Planning lodged ·2025-02 ·DCD
  765. Corscale Gainesville Crossing ·first on record · stage Under construction ·2025-01-29 ·corscale.com corscale.com
  766. Comanche Circle ·first on record · stage Announced ·2025-01-22 ·DCD
  767. Riot Corsicana campus ·condition Paused ·2025-01-21 ·sec.gov
  768. APL ·first on record · stage Announced ·2025-01-20 ·aplgroup.com
  769. PowerHouse Louisville ·first on record · stage Announced ·2025-01-17 ·DCD
  770. STACK Infrastructure JHB01 ·first on record · stage Announced ·2025-01-14 ·STACK Infrastructure DCD
  771. TECfusions Keystone Connect ·stage Announced ·2025-01-14 ·prnewswire.com DCD
  772. Amazon Web Services Butts County data centres ·first on record · stage Announced ·2025-01-07 ·datacentercensus.com suedatacenters.org
  773. Amazon Web Services Douglas County data centres ·first on record · stage Announced ·2025-01-07 ·elevatedouglas.com douglascountysentinel.com
  774. Ansan Choji-dong data centre ·first on record · stage Planning approved ·2024-12-31 ·kyeongin.com
  775. Balico Pittsylvania data centre campus ·first on record · stage Announced ·2024-12-31 ·Cardinal News
  776. Brightseat Tech Park ·stage Planning lodged ·2024-12-31 ·DCD
  777. Chesapeake Great Bridge data centre ·first on record · stage Connection offered ·2024-12-31 ·whro.org
  778. CloudHQ SAT Campus ·first on record · stage Under construction ·2024-12-31 ·centexdatacenters.org
  779. COPT Van Meter data centre campus ·first on record · stage Announced ·2024-12-31 ·sec.gov
  780. Diode Ventures Peculiar campus ·stage Announced ·2024-12-31 ·realclear.ai DCD
  781. Google Fort Wayne data centre ·first on record · stage Under construction ·2024-12-31 ·Google
  782. IREN Sweetwater ·first on record · stage Connection applied ·2024-12-31 ·sec.gov
  783. Meta Jeffersonville Data Center ·first on record · stage Under construction ·2024-12-31 ·Meta
  784. PowerHouse ABX-1 ·milestone Ownership changed ·2024-12-31 ·americanrepartners.com
  785. Riot Corsicana campus ·milestone Expanded ·2024-12-31 ·sec.gov
  786. TECfusions Keystone Connect ·first on record · milestone Ownership changed ·2024-12-31 ·penncapital-star.com DCD
  787. Gumi Advanced AI Data Centre Cluster ·first on record · stage Announced ·2024-12-13 ·gumi.go.kr gb.go.kr Asia Economy gb.go.kr
  788. Edged Kansas City ·first on record · stage Energised ·2024-12-12 ·ded.mo.gov
  789. Privasia Silverstreams data centre ·first on record · stage Announced ·2024-12-11 ·theedgemalaysia.com
  790. APL Itoshima data centre ·first on record · stage Announced ·2024-12-05 ·data-max.co.jp fukuoka-now.com
  791. GDC Kulim KLM1 ·first on record · stage Announced ·2024-12-05 ·theedgemalaysia.com
  792. NTT DATA Johor Bahru JHB10 ·first on record · stage Announced ·2024-12-05 ·NTT DATA
  793. AVAIO Project Hercules ·first on record · stage Announced ·2024-12 ·appomattoxcountyva.gov Cardinal News
  794. Avemore data centre park ·first on record · stage Planning lodged ·2024-12 ·DCD
  795. Hut 8 River Bend ·first on record · stage Announced ·2024-12 ·compute-atlas.com cajunconservatism.com opportunitylouisiana.gov
  796. Klondike data centre ·first on record · stage Planning lodged ·2024-12 ·files.dep.state.pa.us files.dep.state.pa.us
  797. Meta Richland Parish Data Center ·first on record · stage Announced ·2024-12 ·Meta opportunitylouisiana.gov
  798. Google Elmina Business Park DC 2 ·first on record · stage Announced ·2024-11-30 ·klse.i3investor.com
  799. Core Scientific Muskogee ·stage Under construction ·2024-11-25 ·okcommerce.gov sec.gov
  800. Sailfish Social Circle data centre campus ·first on record · stage Planning lodged ·2024-11-20 ·DCD
  801. Nebius Kansas City data centre ·first on record · stage Announced ·2024-11-19 ·Nebius sec.gov
  802. Perlis Advance Tech Park ·first on record · stage Announced ·2024-11-16 ·skyvast.co mida.gov.my berita.rtm.gov.my
  803. MARA Hopedale ·first on record · milestone Ownership changed ·2024-11-05 ·sec.gov sec.gov compute-atlas.com
  804. CyrusOne Bosque County Data Center ·first on record · stage Planning lodged ·2024-11 ·DCD
  805. Keppel Tokyo Data Centre 2 ·first on record · stage Under construction ·2024-11 ·dcmarketinsights.com
  806. Wylie Capital Merrillville data centre ·first on record · stage Planning lodged ·2024-11 ·DCD
  807. Amazon Quantum Frederick site ·first on record · stage Planning lodged ·2024-10-29 ·everydatacenter.com DCD
  808. Vantage New Albany ·first on record · stage Under construction ·2024-10-25 ·Vantage
  809. Area Group Delapan data centre campus ·first on record · stage Announced ·2024-10-10 ·delapan.my
  810. Project Peach ·first on record · stage Planning lodged ·2024-10-03 ·nearbydatacenters.org
  811. Google Elmina Business Park DC 1 ·stage Under construction ·2024-10-01 ·simedarbyproperty.com mida.gov.my mida.gov.my
  812. Mapletree Industrial Trust West Tokyo ·first on record · stage Announced ·2024-10-01 ·Mingtiandi
  813. Amazon Ashton Avenue data centre ·first on record · condition Contestedplanning approval ·2024-10 ·DCD
  814. Core Scientific Hunt County ·first on record · stage Connection offered ·2024-10 ·sec.gov
  815. Diode Ventures Peculiar campus ·first on record · condition Cancelledplanning approval ·2024-10 ·iowapublicradio.org
  816. Oracle Malaysia cloud region ·first on record · stage Announced ·2024-10 ·mida.gov.my datacenterknowledge.com
  817. Project Gravity ·first on record · stage Announced ·2024-10 ·desmog.com
  818. Jecheon 4th Industrial Complex RE100 data centre ·first on record · stage Announced ·2024-09-30 ·wikitree.co.kr
  819. Equinix TY15 ·first on record · stage Energised ·2024-09-29 ·cafe-dc.com
  820. Blueprint Georgetown ·first on record · stage Planning approved ·2024-09 ·hellogeorgetown.com
  821. Core Scientific Muskogee ·condition ended Resumed ·2024-09 ·sec.gov
  822. Dover DC SM1A ·first on record · stage Planning approved ·2024-09 ·Dover DC DCD The Urban Developer North Central Review certifiedstrategic.com nextmsc.com
  823. Shin Young S&D Siksa-dong and Munbong-dong data centres ·first on record · stage Planning lodged ·2024-09 ·The Korea Times
  824. NEXTDC S5 ·first on record · condition Contestedplanning approval ·2024-08-30 ·NSW planning portal
  825. Meta Aiken Data Center ·first on record · stage Announced ·2024-08-29 ·governor.sc.gov
  826. Magna PFV Deogi-dong ·condition Contestedcommunity opposition ·2024-08-28 ·nspna.com
  827. T5 ATL IV ·stage Announced ·2024-08-28 ·T5 DCD
  828. Merit Legacy Technology Park ·stage Planning approved ·2024-08-26 ·DCD
  829. Edged Atlanta ·first on record · stage Energised ·2024-08-21 ·Edged
  830. Novva Mesa ·first on record · stage Announced ·2024-08-21 ·prnewswire.com Novva
  831. Merit Legacy Technology Park ·first on record · stage Planning lodged ·2024-08-13 ·azbex.com
  832. PDG SG3 ·first on record · milestone Ownership changed ·2024-08-13 ·Mingtiandi
  833. Tilon Jeju net-zero data centre ·first on record · stage Announced ·2024-08-09 ·ihalla.com
  834. Vantage KUL2 Cyberjaya campus ·stage Under construction ·2024-08-06 ·Vantage
  835. EdgeConneX Chicago ·first on record · stage Planning lodged ·2024-08-02 ·epa.illinois.gov epa.illinois.gov
  836. AWS Asia Pacific ·first on record · stage Energised ·2024-08 ·mida.gov.my
  837. Vantage Westlake ·first on record · stage Planning lodged ·2024-08 ·DCD
  838. AirTrunk JHB1 ·first on record · stage Energised ·2024-07-31 ·tnb.com.my
  839. TM Nxera Johor campus ·stage Under construction ·2024-07-25 ·mida.gov.my mida.gov.my
  840. CyrusOne Mesa data centre campus ·first on record · stage Planning approved ·2024-07-24 ·azbex.com
  841. EdgeCore Culpeper ·first on record · stage Announced ·2024-07-18 ·EdgeCore EdgeCore
  842. Route 58 East Data Center Campus ·first on record · stage Planning approved ·2024-07-16 ·DCD
  843. Mitsui Fudosan Hino data centres ·first on record · stage Announced ·2024-07-11 ·mitsuifudosan.co.jp
  844. Fujitsu Malaga Data Centre ·first on record · milestone Ownership changed ·2024-07-08 ·announcements.asx.com.au
  845. Equalbase Sunway City Iskandar Puteri DC land ·first on record · stage Announced ·2024-07-03 ·digitalnewsasia.com
  846. Meta Cheyenne Data Center ·first on record · stage Announced ·2024-07-02 ·datacentercensus.com
  847. Blueprint Taylor campus ·first on record · stage Planning approved ·2024-07 ·hellogeorgetown.com
  848. GLP Akishima ·first on record · condition Contestedcommunity opposition ·2024-07 ·DCD
  849. York II Energy Center data centre ·first on record · stage Announced ·2024-07 ·technical.ly
  850. TM Iskandar Puteri Core Data Centre ·first on record · stage Announced ·2024-06-18 ·mida.gov.my
  851. TM Nxera Johor campus ·first on record · stage Announced ·2024-06-18 ·mida.gov.my mida.gov.my
  852. Macquarie IC3 Super West ·first on record · stage Under construction ·2024-06-17 ·DCD
  853. Sentinel Green Fig data centre ·stage Planning approved ·2024-06-12 ·eastwhiteland.org
  854. Provident Chesterton data centre ·first on record · condition Cancelledwithdrawn by proponent ·2024-06-10 ·DCD
  855. DataNovaX Pioneer Park ·first on record · stage Announced ·2024-06-05 ·dallasinnovates.com
  856. Apple Prineville data centre ·first on record · stage Planning lodged ·2024-06-03 ·datacenterknowledge.com
  857. Pi Data Centre Cyberjaya ·first on record · stage Announced ·2024-06-01 ·mida.gov.my
  858. Core Scientific Denton ·milestone Expanded ·2024-06 ·sec.gov
  859. CyrusOne Yorkville Technology Campus ·stage Planning approved ·2024-06 ·DCD
  860. CyrusOne Yorkville Technology Campus ·first on record · stage Announced ·2024-06 ·DCD CyrusOne
  861. Skybox PowerCampus Dallas ·stage Under construction ·2024-06 ·DCD Skybox
  862. T5 ATL IV ·first on record · stage Planning lodged ·2024-06 ·DCD
  863. Mah Sing DC Hub @ Southville City ·first on record · stage Announced ·2024-05-30 ·mida.gov.my mahsing.com.my mida.gov.my The Star
  864. ESR Ariake Data Centre ·first on record · stage Announced ·2024-05-16 ·DCD
  865. Goodman Project Duke Data Centre ·first on record · stage Planning lodged ·2024-05-16 ·NSW planning portal NSW planning portal NSW planning portal
  866. PowerHouse Irving ·first on record · stage Announced ·2024-05-15 ·PowerHouse PowerHouse
  867. Compass Loudoun County campus ·first on record · stage Under construction ·2024-05-08 ·Compass
  868. Google Elmina Business Park DC 1 ·first on record · stage Announced ·2024-05 ·mida.gov.my
  869. Province Group Powhatan campus ·first on record · stage Planning lodged ·2024-05 ·DCD
  870. T5@Chicago IV ·first on record · stage Announced ·2024-05 ·DCD everydatacenter.com
  871. Vantage KIX1 ·first on record · stage Under construction ·2024-05 ·DCD Vantage datacenter-maps.com
  872. Tract Peru Shelf Technology Park ·first on record · stage Under construction ·2024-04-30 ·Tract
  873. Amazon northern Indiana data centre campuses ·first on record · stage Announced ·2024-04-25 ·events.in.gov Amazon
  874. CDC Marsden Park Campus ·first on record · stage Planning lodged ·2024-04-24 ·NSW planning portal
  875. Goodman Project Pluto ·first on record · stage Planning lodged ·2024-04-08 ·DCD
  876. Amazon Dumfries Road site ·first on record · milestone Ownership changed ·2024-04 ·globaldatacenters.net Data Center Frontier
  877. Meta Rosemount Data Center ·first on record · stage Announced ·2024-03-14 ·mn.gov rosemountmn.gov
  878. DC BLOX Birmingham ·first on record · milestone Expanded ·2024-03-07 ·DC BLOX
  879. Core Scientific Austin ·first on record · stage Announced ·2024-03-06 ·sec.gov
  880. Brightseat Tech Park ·first on record · stage Planning approved ·2024-03 ·compute-atlas.com DCD
  881. Bridge Data Centres MY02 Cyberjaya ·first on record · stage Announced ·2024-02-29 ·mida.gov.my DCD
  882. Yondr Northern Virginia campus ·stage Under construction ·2024-02-12 ·Yondr
  883. BEP ·first on record · stage Announced ·2024-02-06 ·metroseoul.co.kr
  884. Busan Eco Delta City Green DC cluster ·first on record · stage Announced ·2024-02-06 ·busan.go.kr
  885. Busan Eco Delta Green Data Center ·first on record · stage Announced ·2024-02-06 ·busan.go.kr
  886. Empyrion Eco Delta City data centre ·first on record · stage Announced ·2024-02-06 ·twig24.com busan.go.kr
  887. Ardent Pittsburgh AI data centre ·first on record · milestone Ownership changed ·2024-01-22 ·northerndata.de
  888. Amazon Round Rock PUD ·first on record · stage Planning approved ·2024-01-11 ·roundrocktexas.gov
  889. STACK NVA06 ·first on record · stage Announced ·2024-01-10 ·STACK Infrastructure
  890. Amazon Madison County data centre campus ·first on record · stage Announced ·2024-01 ·madisonmegasite.com compute-atlas.com
  891. EdgeCore Mesa North Campus ·first on record · stage Planning lodged ·2024-01 ·datacenterrecord.org
  892. Kakao Data Center Ansan ·stage Energised ·2024-01 ·kakaocorp.com
  893. MARA Granbury data centre ·first on record · milestone Ownership changed ·2024-01 ·sec.gov sec.gov sec.gov
  894. Amazon Lake Anna Technology Campus ·stage Announced ·2023-12-31 ·Amazon
  895. Google Lincoln data centre ·first on record · stage Announced ·2023-12-31 ·Google
  896. Keppel DC Singapore 7 ·first on record · stage Energised ·2023-12-31 ·Keppel
  897. Riot Rockdale site ·milestone Expanded ·2023-12-31 ·sec.gov
  898. Skybox PowerCampus Dallas ·first on record · stage Announced ·2023-12-31 ·DCD Skybox
  899. Stockland Project A ·stage Planning lodged ·2023-12-31 ·NSW planning portal NSW planning portal
  900. T5@Chicago III ·first on record · stage Announced ·2023-12-31 ·DCD
  901. Auburndale Technology Center ·first on record · stage Planning approved ·2023-12-18 ·tampabay28.com baynews9.com
  902. Yondr Northern Virginia campus ·stage Energising ·2023-12-18 ·DCD
  903. Yondr Northern Virginia campus ·stage Energised ·2023-12-18 ·Yondr
  904. Jay data centre ·first on record · milestone Ownership changed ·2023-12 ·enr.com sunjournal.com
  905. SK Suseong Alpha City AI data centre ·first on record · stage Announced ·2023-12 ·hankyung.com mk.co.kr
  906. Woodlawn data centre ·first on record · stage Planning lodged ·2023-12 ·natureforward.org
  907. Sentinel Green Fig data centre ·first on record · stage Planning lodged ·2023-11-10 ·eastwhiteland.org
  908. Amazon Mesa Pecos Road data centre ·first on record · stage Announced ·2023-11-06 ·Bisnow
  909. AWS Incheon Gajwa Tech Centre ·stage Planning approved ·2023-11 ·mk.co.kr incheontoday.com
  910. AWS Incheon Gajwa Tech Centre ·first on record · stage Planning lodged ·2023-11 ·incheontoday.com
  911. Devlin Technology Park ·stage Planning approved ·2023-11 ·DCD bristowbeat.com
  912. Vantage San Antonio ·first on record · stage Planning lodged ·2023-11 ·DCD
  913. Supernode ·first on record · stage Planning approved ·2023-10-31 ·Quinbrook Moreton Daily
  914. AirTrunk OSK1 ·first on record · stage Announced ·2023-10-17 ·cloud.watch.impress.co.jp AirTrunk
  915. NEXTDC S4 Data Centre Phase 2 ·first on record · stage Planning lodged ·2023-10-16 ·NSW planning portal
  916. Amazon Carter's Store Tech Campus ·stage Planning approved ·2023-10-10 ·suedatacenters.org compute-atlas.com DCD
  917. Amazon Summit Crossing Tech Campus ·first on record · stage Planning approved ·2023-10 ·suedatacenters.org DCD
  918. QTS York County ·first on record · stage Announced ·2023-09-19 ·governor.sc.gov
  919. AirTrunk SYD3 ·stage Planning approved ·2023-09-15 ·NSW planning portal
  920. Sabey SDC Umatilla ·first on record · stage Announced ·2023-09-14 ·Sabey
  921. STACK SVY03A Data Center Campus ·first on record · stage Planning lodged ·2023-09-14 ·California Energy Commission files.ceqanet.lci.ca.gov California Energy Commission
  922. EdgeConneX Kuala Lumpur CBD ·first on record · stage Announced ·2023-09-11 ·EdgeConneX
  923. SK Ecoplant Pohang landing-station data centre campus ·first on record · stage Announced ·2023-09-08 ·kedglobal.com DCD
  924. Google Red Oak data centre ·first on record · stage Announced ·2023-09-01 ·DCD
  925. Amazon Lake Anna Technology Campus ·first on record · stage Planning lodged ·2023-09 ·DCD
  926. Hyosung Anyang Hogye-dong data centre ·first on record · condition Cancelledcommunity opposition ·2023-09 ·economist.co.kr
  927. TECfusions Clarksville Data Center ·stage Energising ·2023-09 ·tecfusions.com
  928. EdgeCore Reno ·stage Announced ·2023-08-10 ·prnewswire.com
  929. EdgeCore Reno ·first on record · stage Under construction ·2023-08-10 ·prnewswire.com DCD
  930. GreenSquareDC WAi1 ·first on record · stage Planning approved ·2023-08-09 ·techbusinessnews.com.au DCD Baxtel
  931. Gapyeong data centre ·first on record · stage Announced ·2023-08 ·fnnews.com
  932. GLP ·first on record · stage Under construction ·2023-08 ·DCD
  933. TECfusions Clarksville Data Center ·first on record · stage Under construction ·2023-08 ·tecfusions.com
  934. CoreWeave Plano data centre ·first on record · stage Announced ·2023-07-25 ·prnewswire.com
  935. SK Broadband Yangju Data Center ·stage Under construction ·2023-07-25 ·Asia Economy
  936. Microsoft Kemps Creek ·first on record · stage Planning approved ·2023-07-13 ·NSW planning portal
  937. Culpeper Technology Campus ·stage Announced ·2023-07-07 ·DCD
  938. Homer City Energy Campus ·first on record · milestone Decommissioned ·2023-07-01 ·homercityredevelopment.com
  939. Culpeper Technology Campus ·first on record · stage Planning approved ·2023-07 ·DCD
  940. Equinix xScale TY12x/TY13x ·first on record · milestone Expanded ·2023-07 ·DCD
  941. FutureData Sarawak data centre park ·first on record · stage Announced ·2023-06-26 ·DCD
  942. SK Broadband Yangju Data Center ·stage Planning approved ·2023-06-20 ·Asia Economy
  943. Amazon Caroline County campus ·first on record · stage Planning lodged ·2023-06 ·DCD virginiabusiness.com
  944. Amazon Carter's Store Tech Campus ·first on record · stage Planning lodged ·2023-06 ·DCD suedatacenters.org
  945. Digital Edge TYO7 ·stage Under construction ·2023-06 ·cafe-dc.com
  946. Sabey SDC Quincy ·first on record · stage Energised ·2023-06 ·dcmarketinsights.com
  947. Percheron Data Center ·first on record · stage Planning lodged ·2023-05-19 ·morrowcountyor.gov
  948. Vantage KUL2 Cyberjaya campus ·first on record · stage Announced ·2023-05-16 ·Vantage DCD Vantage
  949. Wilderness Crossing data centre complex ·stage Planning approved ·2023-04-25 ·Piedmont Environmental Council
  950. Surry Green Energy Center data centre park ·first on record · stage Announced ·2023-04-12 ·virginiabusiness.com water2.energy Data Center Frontier
  951. Dohwa Data Centre ·first on record · stage Planning approved ·2023-04 ·Asia Economy
  952. Dreammark1 Incheon Gajwa Data Centre ·first on record · stage Under construction ·2023-04 ·eng.dream-mark1.co.kr
  953. Amazon Culpeper campus ·first on record · stage Connection applied ·2023-03-06 ·dgtlinfra.com
  954. Digital Edge TYO7 ·first on record · stage Announced ·2023-03 ·cafe-dc.com
  955. Kenwood data centre ·first on record · milestone Ownership changed ·2023-03 ·cbs6albany.com
  956. Magna PFV Deogi-dong ·first on record · stage Planning approved ·2023-03 ·nspna.com
  957. Amazon Warrenton data centre ·stage Planning approved ·2023-02 ·DCD
  958. EdgeCore Silicon Valley ·first on record · stage Under construction ·2023-01-25 ·prnewswire.com
  959. Amazon Warrenton data centre ·first on record · stage Planning lodged ·2022-12-31 ·DCD
  960. Devlin Technology Park ·first on record · stage Planning lodged ·2022-12-31 ·DCD
  961. Google Omaha data centre ·first on record · stage Announced ·2022-12-31 ·Google
  962. Novva Tahoe Reno ·first on record · milestone Ownership changed ·2022-12-31 ·Novva prnewswire.com
  963. Open DC PE2 Penang ·first on record · stage Announced ·2022-12-31 ·DCD
  964. Riot Corsicana campus ·first on record · stage Announced ·2022-12-31 ·sec.gov sec.gov
  965. STACK Klickitat County data centre campus ·first on record · stage Connection applied ·2022-12-31 ·compute-atlas.com goldendalesentinel.com
  966. TRON USA AI Campus ·first on record · milestone Ownership changed ·2022-12-31 ·readingeagle.com
  967. Google Becker data centre ·condition Cancelledwithdrawn by proponent ·2022-12-21 ·mprnews.org
  968. KT Cloud Gaebong data centre ·first on record · stage Planning approved ·2022-12 ·biz.chosun.com
  969. Microsoft Garden Drive ·first on record · stage Under construction ·2022-12 ·Microsoft
  970. Microsoft Woods Road ·first on record · stage Under construction ·2022-12 ·Microsoft
  971. Microsoft Lane Cove North ·condition Contestedplanning approval ·2022-11-25 ·NSW planning portal
  972. Powerlink Chungju data centre ·first on record · stage Announced ·2022-11-10 ·news.tf.co.kr
  973. ESR Cosmosquare campus ·first on record · stage Under construction ·2022-11-08 ·retalkasia.com
  974. AIMS Cyberjaya 200MW AI data centre ·first on record · milestone Ownership changed ·2022-11 ·DCD
  975. Microsoft Conover Lyle Creek datacenter ·first on record · stage Announced ·2022-11 ·conovernc.gov
  976. SK Broadband Yangju Data Center ·first on record · stage Planning lodged ·2022-11 ·Asia Economy
  977. Microsoft Cawley Road campus ·first on record · stage Under construction ·2022-10-26 ·Microsoft
  978. AirTrunk SYD3 ·stage Announced ·2022-10-25 ·announcements.asx.com.au
  979. Bridge Data Centres MY06 ·stage Energised ·2022-10-20 ·DCD
  980. ByteDance Sedenak expansion ·first on record · stage Energised ·2022-10-20 ·DCD
  981. NTT Keihanna Data Center ·first on record · stage Announced ·2022-09-29 ·DCD
  982. STACK/ESR ICN01A Bupyeong ·first on record · stage Announced ·2022-09-08 ·itnews.asia
  983. NTT Cyberjaya campus ·first on record · stage Under construction ·2022-09-05 ·mida.gov.my
  984. PowerHouse ABX-1 ·first on record · stage Under construction ·2022-09 ·dpr.com
  985. NEXTDC A1 Adelaide ·first on record · stage Announced ·2022-08-29 ·announcements.asx.com.au
  986. YTL Green Data Center Park ·stage Under construction ·2022-08-25 ·mida.gov.my
  987. CloudHQ MSP Campus ·first on record · stage Planning approved ·2022-08-15 ·chaskamn.gov
  988. CloudHQ ORD Campus ·first on record · stage Announced ·2022-08 ·kapwork.com
  989. CyrusOne Allen DFW3-DFW5 ·first on record · stage Planning lodged ·2022-08 ·DCD
  990. KT Cloud Gasan AI Data Center ·first on record · stage Under construction ·2022-07-07 ·koreajoongangdaily.com
  991. NTT Gainesville campus ·stage Announced ·2022-06-14 ·Data Center Frontier
  992. Princeton Digital Group TY1 ·stage Under construction ·2022-06-13 ·dcatlas.io
  993. AirTrunk SYD3 ·first on record · stage Planning lodged ·2022-04-26 ·NSW planning portal
  994. YTL Green Data Center Park ·first on record · stage Announced ·2022-04-21 ·ytl.com mida.gov.my
  995. Skybox Austin I ·first on record · stage Announced ·2022-03 ·Skybox
  996. Potomac Technology Park ·first on record · stage Planning lodged ·2022-02-07 ·DCD
  997. Core Scientific Muskogee ·first on record · stage Announced ·2022-02 ·sec.gov sec.gov sec.gov DCD
  998. Pacific Sunny Data Center Yongin Jukjeon ·first on record · stage Under construction ·2022-02 ·en.hdec.kr
  999. Equinix SL2x ·first on record · stage Announced ·2022-01-26 ·sec.gov DCD DCD
  1000. Bridge Data Centres MY06 ·first on record · stage Announced ·2021-12-31 ·DCD
  1001. Catlett Station ·first on record · stage Planning lodged ·2021-12-31 ·DCD
  1002. Element Critical Houston One ·first on record · milestone Ownership changed ·2021-12-31 ·prnewswire.com
  1003. Meta Eagle Mountain Data Center ·stage Energised ·2021-12-31 ·Meta
  1004. Meta Mesa Data Center ·first on record · stage Under construction ·2021-12-31 ·Meta
  1005. NTT Gainesville campus ·stage Planning lodged ·2021-12-31 ·princewilliamtimes.com
  1006. PowerHouse Pacific ·first on record · milestone Ownership changed ·2021-12-31 ·constructionreviewonline.com
  1007. STT Seoul 1 ·first on record · stage Announced ·2021-12-31 ·DCD
  1008. Switch Foundry West ·first on record · milestone Ownership changed ·2021-12-31 ·Switch DCD
  1009. Kakao Data Center Ansan ·stage Under construction ·2021-12-17 ·ansan.go.kr
  1010. NTT Gainesville campus ·first on record · stage Planning approved ·2021-12 ·princewilliamtimes.com
  1011. DataBank IAD3 ·first on record · stage Announced ·2021-11-08 ·prnewswire.com
  1012. NRI Osaka Data Center II ·first on record · stage Under construction ·2021-11 ·nri.com nri.com
  1013. Macquarie Data Centres ~200 MW Macquarie Park campus ·first on record · stage Planning lodged ·2021-10-22 ·NSW planning portal
  1014. DCI Poplars Data Centre ·first on record · stage Planning lodged ·2021-10-19 ·NSW planning portal NSW planning portal
  1015. Core Scientific Denton ·first on record · stage Announced ·2021-10 ·sec.gov sec.gov
  1016. Novva Las Vegas ·first on record · stage Under construction ·2021-10 ·DCD
  1017. Viking Data Centers Akron ·first on record · stage Announced ·2021-09 ·sec.gov sec.gov
  1018. DCI ADL03 Mawson Lakes ·stage Planning approved ·2021-08-30 ·thetechcapital.com dcidatacenters.com
  1019. DCI ADL03 Mawson Lakes ·first on record · stage Announced ·2021-08-30 ·thetechcapital.com dcidatacenters.com
  1020. Switch The Rock Campus ·stage Planning approved ·2021-07-22 ·centexdatacenters.org askthegrid.com
  1021. NTT Smart Connect Sonezaki Data Center ·first on record · stage Announced ·2021-07-14 ·cloud.watch.impress.co.jp
  1022. Digital Crossroads Hammond data centre ·first on record · milestone Ownership changed ·2021-07 ·GovTech
  1023. Princeton Digital Group TY1 ·first on record · stage Announced ·2021-06-24 ·dcatlas.io
  1024. OneAsia Network Busan data centre ·first on record · stage Announced ·2021-06-17 ·busan.go.kr busan.go.kr oneas1a.com
  1025. Microsoft Station Road campus ·first on record · stage Planning lodged ·2021-06-07 ·NSW planning portal NSW planning portal
  1026. Yondr Northern Virginia campus ·first on record · stage Announced ·2021-06-02 ·Yondr
  1027. Switch The Rock Campus ·first on record · stage Announced ·2021-06-01 ·centexdatacenters.org askthegrid.com
  1028. DUG Geraldton supercomputing campus ·first on record · stage Announced ·2021-05-25 ·dug.com announcements.asx.com.au
  1029. DC BLOX Greenville ·first on record · stage Under construction ·2021-04-01 ·DC BLOX
  1030. Cologix COL4 ·first on record · stage Announced ·2021-03 ·DCD
  1031. Wilderness Crossing data centre complex ·first on record · stage Planning lodged ·2021-03 ·Piedmont Environmental Council
  1032. Microsoft Lane Cove North ·first on record · stage Planning lodged ·2021-02-16 ·NSW planning portal NSW planning portal NSW planning portal
  1033. Hayward Exchange @ 92 ·first on record · stage Planning approved ·2021-02-11 ·hayward-ca.gov hayward-ca.gov
  1034. Microsoft Douglasville datacenter ·first on record · stage Announced ·2021-02-11 ·Microsoft
  1035. CoreSite LA3 ·milestone Expanded ·2020-12-31 ·sec.gov
  1036. CoreSite LA3 ·stage Energised ·2020-12-31 ·sec.gov
  1037. CoreSite SV8 ·first on record · milestone Expanded ·2020-12-31 ·sec.gov
  1038. Flexential Portland - Hillsboro 3 ·first on record · stage Announced ·2020-12-31 ·prnewswire.com
  1039. Kakao Data Center Ansan ·first on record · stage Announced ·2020-12-31 ·DCD
  1040. Meta DeKalb Data Center ·first on record · stage Under construction ·2020-12-31 ·Meta
  1041. Tokyo Fuchu Data Center ·first on record · stage Energised ·2020-12-01 ·softbank.jp
  1042. CoreSite LA3 ·first on record · stage Under construction ·2020-12 ·sec.gov
  1043. SCSK netXDC Chiba No.3 Center ·first on record · stage Announced ·2020-11-24 ·cloud.watch.impress.co.jp
  1044. Stockland Project A ·first on record · stage Planning approved ·2020-11-12 ·NSW planning portal
  1045. Equinix PE3 Perth ·first on record · stage Announced ·2020-11 ·DCD
  1046. Great Oaks South Data Center ·first on record · stage Planning lodged ·2020-10-23 ·files.ceqanet.lci.ca.gov
  1047. SK consortium Saemangeum data centre ·first on record · stage Announced ·2020-10-19 ·koreaherald.com datacentremagazine.com jjan.kr saemangeum.go.kr
  1048. Stockland Fife Kemps Creek campus ·first on record · stage Planning lodged ·2020-10 ·NSW planning portal inforcapital.com
  1049. Pier DC ·first on record · milestone Ownership changed ·2020-09-11 ·announcements.asx.com.au
  1050. Copper Ridge ·first on record · stage Under construction ·2020-08-25 ·Piedmont Environmental Council
  1051. Gigaland ·first on record · milestone Renamed ·2020-08-25 ·Piedmont Environmental Council
  1052. Equinix SY9x + SY10x xScale campus ·stage Planning approved ·2020-07-31 ·NSW planning portal
  1053. Equinix SY9x + SY10x xScale campus ·first on record · stage Planning lodged ·2020-06-25 ·NSW planning portal
  1054. NEXTDC S3 Sydney ·first on record · stage Planning lodged ·2020-06-12 ·NSW planning portal
  1055. Stockland Macquarie Park Stage 1 ·first on record · stage Planning lodged ·2020-05-29 ·NSW planning portal NSW planning portal
  1056. Lafayette Data Center ·first on record · stage Planning lodged ·2020-05-20 ·California Energy Commission
  1057. Riot Rockdale site ·first on record · stage Connection offered ·2020-05 ·sec.gov
  1058. Walsh Data Center ·condition Contested ·2020-04-15 ·California Energy Commission
  1059. STACK SVY02 ·first on record · stage Announced ·2020-01 ·DCD
  1060. Google Becker data centre ·first on record · stage Announced ·2019-12-31 ·mprnews.org
  1061. Google Montgomery County data centre ·stage Energised ·2019-12-31 ·Google
  1062. Google New Albany data centre ·first on record · stage Under construction ·2019-12-31 ·Google
  1063. Google Papillion data centre ·stage Announced ·2019-12-31 ·Google sec.gov
  1064. Google Papillion data centre ·first on record · stage Under construction ·2019-12-31 ·sec.gov
  1065. STNet Powerico data centre ·milestone Expanded ·2019-12-31 ·itmedia.co.jp
  1066. NTT Osaka No.7 Data Center ·first on record · stage Energised ·2019-12-01 ·cloud.watch.impress.co.jp
  1067. Mission College Data Center ·first on record · stage Planning lodged ·2019-11-25 ·California Energy Commission California Energy Commission California Energy Commission
  1068. CDC Eastern Creek Campus + expansion ·stage Connection applied ·2019-10-24 ·NSW planning portal
  1069. QTnet Data Center Hakata Station ·first on record · stage Energised ·2019-09 ·cloud.watch.impress.co.jp
  1070. NEXTDC B2 Brisbane ·first on record · milestone Expanded ·2019-08-29 ·announcements.asx.com.au
  1071. NEXTDC P1 Perth ·first on record · milestone Ownership changed ·2019-08-29 ·announcements.asx.com.au
  1072. Sequoia Data Center ·first on record · stage Planning lodged ·2019-08-14 ·California Energy Commission
  1073. CDC Eastern Creek Campus + expansion ·stage Connection offered ·2019-06-28 ·NSW planning portal
  1074. Walsh Data Center ·first on record · stage Planning lodged ·2019-06-28 ·California Energy Commission California Energy Commission California Energy Commission
  1075. CDC Eastern Creek Campus + expansion ·stage Planning lodged ·2019-05-09 ·NSW planning portal NSW planning portal NSW planning portal
  1076. NEC Kobe Data Center ·milestone Expanded ·2019-03-28 ·cloud.watch.impress.co.jp DCD
  1077. NEC Nagoya Data Center ·first on record · stage Energised ·2019-03-28 ·cloud.watch.impress.co.jp
  1078. QTS Manassas 1 ·first on record · milestone Ownership changed ·2019-02-22 ·sec.gov
  1079. Digital Loyang II ·first on record · stage Announced ·2019-01-30 ·DCD
  1080. Equinix SL1 ·first on record · stage Announced ·2019-01-14 ·Equinix
  1081. Google Loudoun County data centre ·first on record · stage Announced ·2018-12-31 ·static.googleusercontent.com
  1082. Meta Eagle Mountain Data Center ·first on record · stage Under construction ·2018-12-31 ·Meta Meta
  1083. Meta Huntsville Data Center ·first on record · stage Under construction ·2018-12-31 ·Meta
  1084. Meta Los Lunas Data Center ·stage Energised ·2018-12-31 ·Meta
  1085. Meta Stanton Springs Data Center ·first on record · stage Under construction ·2018-12-31 ·Meta
  1086. Remington Technology Park ·first on record · stage Planning approved ·2018-12-31 ·fauquier.com
  1087. Switch The Core Campus ·first on record · milestone Expanded ·2018-12-31 ·sec.gov
  1088. CoreSite DE1 ·first on record · milestone Expanded ·2018-09 ·sec.gov
  1089. EdgeConneX Atlanta ·first on record · stage Announced ·2018-08-21 ·EdgeConneX
  1090. Dreammark1 Guro IDC ·first on record · milestone Ownership changed ·2018-08 ·eng.dream-mark1.co.kr
  1091. CyrusOne Sterling NVA5-NVA7 ·first on record · milestone Ownership changed ·2018-07-10 ·sec.gov
  1092. CyrusOne Sterling NVA9 ·first on record · milestone Ownership changed ·2018-07-10 ·sec.gov
  1093. Equinix DA1, DA2, DA3 and DA6 ·first on record · milestone Ownership changed ·2018-04 ·sec.gov
  1094. NEXTDC P2 Perth ·first on record · stage Announced ·2018-04 ·datacentercatalog.com
  1095. NTT DATA Mitaka Data Center East ·first on record · stage Energised ·2018-04 ·NTT DATA
  1096. Data Dock Niigata Nagaoka Data Center ·first on record · stage Energised ·2018-01-22 ·ascii.jp
  1097. Iron Mountain NJE-1 ·first on record · milestone Ownership changed ·2018-01-10 ·sec.gov
  1098. Core Scientific Marble ·first on record · milestone Ownership changed ·2017-12-31 ·sec.gov
  1099. DFW 37 ·first on record · stage Announced ·2017-12-31 ·garlandtx.gov
  1100. Equinix SV10 ·first on record · stage Energised ·2017-12-31 ·sec.gov
  1101. Meta Henrico Data Center ·first on record · stage Under construction ·2017-12-31 ·Meta
  1102. Meta New Albany Data Center ·first on record · stage Under construction ·2017-12-31 ·Meta
  1103. Meta Sarpy Data Center ·first on record · stage Under construction ·2017-12-31 ·Meta
  1104. NTT Dallas TX1 ·first on record · stage Energised ·2017-12-31 ·Data Center Frontier
  1105. Digital Realty CH2 ·first on record · milestone Ownership changed ·2017-09-14 ·dcatlas.io
  1106. Digital Realty SC1 ·first on record · milestone Ownership changed ·2017-09 ·dcatlas.io
  1107. Apple Waukee data centre ·first on record · stage Announced ·2017-08-24 ·Apple
  1108. Cassini Gateway I ·first on record · stage Announced ·2017-06-02 ·texomaconnect.com kxii.com
  1109. CyrusOne Somerset NYM1 ·first on record · milestone Ownership changed ·2017-02-28 ·sec.gov
  1110. CoreSite VA2 ·first on record · milestone Expanded ·2016-12-31 ·sec.gov
  1111. Meta Los Lunas Data Center ·first on record · stage Under construction ·2016-12-31 ·Meta
  1112. Enecom EneWings Hiroshima Data Center ·first on record · stage Energised ·2016-12-01 ·cloud.watch.impress.co.jp
  1113. NTT Ashburn VA3 ·first on record · stage Under construction ·2016-12 ·sec.gov sec.gov sec.gov
  1114. Digital Realty ORD13 ·stage Announced ·2016-08 ·sec.gov
  1115. QTS Piscataway ·first on record · milestone Ownership changed ·2016-06-06 ·sec.gov sec.gov
  1116. Microsoft Busan Miumsandan datacenter ·first on record · stage Announced ·2016-05-11 ·busan.go.kr
  1117. NEC Kobe Data Center ·first on record · stage Energised ·2016-04 ·cloud.watch.impress.co.jp
  1118. CyrusOne Aurora CHI1-CHI3 ·first on record · milestone Ownership changed ·2016-03-31 ·sec.gov
  1119. CoreSite CH1 ·first on record · milestone Expanded ·2015-12-31 ·sec.gov
  1120. CoreSite LA2 ·first on record · milestone Expanded ·2015-12-31 ·sec.gov sec.gov
  1121. CoreSite SV7 ·first on record · stage Under construction ·2015-12-31 ·sec.gov
  1122. Google Montgomery County data centre ·first on record · stage Announced ·2015-12-31 ·Google
  1123. Meta Fort Worth Data Center ·first on record · stage Under construction ·2015-12-31 ·Meta
  1124. LG Uplus Pyeongchon Mega Center ·first on record · stage Energised ·2015-08-01 ·lg.co.kr
  1125. H5 Ashburn ·first on record · milestone Ownership changed ·2015-06-10 ·H5 Data Centers
  1126. Amazon Data Center SF011 ·first on record · stage Planning approved ·2015-02-20 ·hayward-ca.gov hayward-ca.gov
  1127. Colovore Santa Clara ·stage Energised ·2014-12-31 ·Colovore
  1128. Digital Realty DFW35 ·first on record · stage Under construction ·2014-10 ·sec.gov sec.gov
  1129. QTS Chicago ·first on record · milestone Ownership changed ·2014-07-08 ·sec.gov
  1130. QTS East Windsor ·first on record · milestone Ownership changed ·2014-06-30 ·sec.gov
  1131. Colovore Santa Clara ·first on record · stage Under construction ·2013-12-31 ·Colovore
  1132. Meta Altoona Data Center ·first on record · stage Under construction ·2013-12-31 ·Meta
  1133. STNet Powerico data centre ·first on record · stage Energised ·2013-12-31 ·itmedia.co.jp
  1134. Fujitsu Akashi System Center data centre ·first on record · milestone Expanded ·2013-11-21 ·cloud.watch.impress.co.jp
  1135. Digital Realty ORD13 ·first on record · stage Under construction ·2013-06 ·sec.gov sec.gov sec.gov sec.gov
  1136. Hitachi Okayama No.3 Center ·first on record · stage Announced ·2012-10-18 ·hitachi.co.jp
  1137. IDC Frontier Fukushima Shirakawa Data Center ·first on record · stage Energised ·2012-10-01 ·internet.watch.impress.co.jp
  1138. Digital Realty ORD12 ·first on record · stage Under construction ·2012-08 ·sec.gov
  1139. Digital Realty ORD14 ·first on record · stage Under construction ·2012-08 ·sec.gov
  1140. CoreSite SV4 ·first on record · stage Planning approved ·2011-12-31 ·sec.gov
  1141. TIS GDC Gotenyama ·first on record · stage Energised ·2011-04 ·it.impress.co.jp
  1142. Fujitsu FIP Yokohama Data Center ·first on record · stage Energising ·2011-01-26 ·cloud.watch.impress.co.jp
  1143. Meta Forest City Data Center ·first on record · stage Under construction ·2010-12-31 ·Meta
  1144. Meta Prineville Data Center ·first on record · stage Under construction ·2010-12-31 ·Meta
  1145. CDC Eastern Creek Campus + expansion ·first on record · stage Planning approved ·2010-12-07 ·NSW planning portal
  1146. Amazon Data Center SF09 ·first on record · stage Planning approved ·2010-07-09 ·hayward-ca.gov
  1147. DigiCo SYD1 expansion ·first on record · stage Planning lodged ·2010-03-26 ·NSW planning portal NSW planning portal NSW planning portal NSW planning portal NSW planning portal NSW planning portal
  1148. Fujitsu Tatebayashi Data Center ·first on record · milestone Expanded ·2009-12-31 ·cloud.watch.impress.co.jp
  1149. Equinix SV5 ·first on record · stage Announced ·2009-09-09 ·sec.gov
  1150. Digital Realty DFW17 ·first on record · milestone Ownership changed ·2009-09 ·dcatlas.io
  1151. Woolworths Erskine Park Data Centre ·first on record · stage Planning lodged ·2008-11-18 ·NSW planning portal

Every event on every project, newest first: project · stage reached or condition · date · source. A stage is how far a project has got; a condition (delayed, contested, paused, cancelled) sits on top of it.