Planning lodgedchanged 2026-08-10
—requested
—offered
—energised
4 mowaiting since first filing
highconfidence · 2 sources
Market
United States · North America
Grid
ERCOT · ERCOT
Place
Pecos County, TX
Network
—
Announced
2026-08-10
Planning lodged
2026-08-04
First reported by
Amazon · planned
Dates it gives
statement 2026-08-10

Timeline

202420262028
before a connection offeroffer to powerpower ondelayed, paused, contested╷ milestone│ today

History

  1. ≤ 2026-08-10date: document dateon or before
    stageAnnouncedconfirmed
    • Amazon primary
      Our new planned data center campus in Pecos County does just that: It's powered by new on-site generation that won't raise electricity costs for Texas families and is designed to transition to grid-connected service as interconnection timelines allow.
  2. 2026-08-04
    stagePlanning lodged1 source
    • finance.yahoo.com press
      Three TDLR filings for a Pecos County Data Center were registered on Tuesday, August 4, calling for three 189,000-square-foot buildings for Amazon Data Services.

Newest first. Every step shows the source and the quote it rests on, checked against that source. Confirmed: a primary source (a register, a filing, the owner's own site) or two sites; a cancellation needs both. 1 source: one so far. Only confirmed dates enter medians and comparables. A stage is how far the project has got; a condition (delayed, contested, paused, cancelled) sits on top of the stage until a later event ends it. Unknown fields show as —.