US Department of Energy · Savannah River Site, SC

Announcedchanged 2025-04
—requested
—offered
—energised
—waiting: no filing date on record
highconfidence · 2 sources
Market
United States · North America
Grid
not settled yet
Place
Savannah River Site, SC
Network
—
Announced
2025-04
First reported by
DCD · planned
Dates it gives
RFP issued 2025-10-01
offers due 2025-12-05

Who is on it

Developer
Amentum · energy.gov

Timeline

202420262028
before a connection offeroffer to powerpower ondelayed, paused, contested╷ milestone│ today

History

  1. 2025-04
    stageAnnouncedconfirmed
    • energy.gov primary
      The U.S. Department of Energy’s National Nuclear Security Administration (DOE/NNSA) today announced the selection of Amentum to enter negotiations for a phased lease to develop an artificial intelligence data center and dedicated on-site energy generation source at the Savannah River Site in South Carolina.
    • DCD press
      The RFP, posted on sam.gov yesterday, calls for an entity to enter into a lease agreement with the Department of Energy in order to design, construct, install, maintain, and operate an “AI data center and energy generation infrastructure.”

Newest first. Every step shows the source and the quote it rests on, checked against that source. Confirmed: a primary source (a register, a filing, the owner's own site) or two sites; a cancellation needs both. 1 source: one so far. Only confirmed dates enter medians and comparables. A stage is how far the project has got; a condition (delayed, contested, paused, cancelled) sits on top of the stage until a later event ends it. Unknown fields show as —.

Report an error