The Hook Lab / Tracker / North America / United States / Digi Power X Columbiana data centre
Updated 2026-11-25
Tracker · United States · US-OTHER · AL
Digi Power X Columbiana data centre
Digi Power X · Columbiana, AL
Energisedchanged 2026-06-13
—requested
—offered
—energised
—closed
highconfidence · 4 sources
- Market
- United States · North America
- Grid
- US-OTHER · Other US (outside the ISOs)
- Place
- Columbiana, AL
- Network
- —
- Announced
- 2025-02-11
- Connection offered
- 2026-06-13
- First power
- 2026-05-15
- First reported by
- abc3340.com · no status given
Who is on it
Timeline
202420262028
before a connection offeroffer to powerpower ondelayed, paused, contested╷ milestone│ today
History
-
≤ 2026-06-13date: document dateon or before
stageConnection offered1 source
- accessnewswire.com press
The Company has already completed construction of the dedicated on-site substation serving Phase 1, with grid interconnection finalized and a power delivery agreement in place with Alabama Power
- accessnewswire.com press
-
2026-05-15
stageEnergisedconfirmed
- sec.gov primary
The Company confirms that the ARMS 200 modular unit has been live and operating successfully at Tier 3 standards at the Company’s Alabama facility since May 15, 2026, and has been generating AI-related revenues for Digi Power X since that date.
- sec.gov primary
-
2025-02-11
stageAnnouncedconfirmed
- sec.gov primary
On February 11, 2025, the Corporation announced that it had launched a subsidiary, US Data Centers, dedicated to the development of HPC and AI-focused data centers. Through the subsidiary, the Corporation plans to complete the transformation of the Corporation’s facility in Columbiana, Alabama into a Tier 3 data center designed to support next-generation AI and HPC workloads.
- accessnewswire.com press
Digi Power X Inc. (Nasdaq:DGXX)(Cboe Canada:DGX) (the "Company" or "Digi Power X"), an AI data center infrastructure operator, today announced the execution of a Master Services Agreement (the "Agreement") with Cerebras Systems (the "Customer") for the colocation of a purpose-built, 40 megawatt ("MW") AI data center campus located in Columbiana, Alabama (the "Facility").
- sec.gov primary
Newest first. Every step shows the source and the quote it rests on, checked against that source. Confirmed: a primary source (a register, a filing, the owner's own site) or two sites; a cancellation needs both. 1 source: one so far. Only confirmed dates enter medians and comparables. A stage is how far the project has got; a condition (delayed, contested, paused, cancelled) sits on top of the stage until a later event ends it. Unknown fields show as —.