The Hook Lab / Tracker / North America / United States / EdgeConneX Chicago
Updated 2026-11-25
Tracker · United States · PJM · IL
EdgeConneX Chicago
EdgeConneX · Chicago, IL
Planning lodgedchanged 2024-08-02
—requested
—offered
—energised
28 mowaiting since first filing
highconfidence · 2 sources
- Market
- United States · North America
- Grid
- PJM · PJM
- Place
- Chicago, IL
- Network
- —
- Planning lodged
- 2024-08-02
- First reported by
- EdgeConneX · no status given
Who is on it
- Owner
- EdgeConneX Chicago Holdings, LLC · epa.illinois.gov
Timeline
202420262028
before a connection offeroffer to powerpower ondelayed, paused, contested╷ milestone│ today
History
-
2024-08-02
stagePlanning lodgedconfirmed
- epa.illinois.gov primary
EdgeConneX submitted a permit application on August 2nd, 2024, for the proposed installation of 14 – 2,750 kilowatts (kW) diesel emergency generators and two 1,250 kW diesel emergency generators.
- epa.illinois.gov primary
in evaluating the above-referenced construction permit application.
- epa.illinois.gov primary
Newest first. Every step shows the source and the quote it rests on, checked against that source. Confirmed: a primary source (a register, a filing, the owner's own site) or two sites; a cancellation needs both. 1 source: one so far. Only confirmed dates enter medians and comparables. A stage is how far the project has got; a condition (delayed, contested, paused, cancelled) sits on top of the stage until a later event ends it. Unknown fields show as —.