STACK Klickitat County data centre campus
STACK Infrastructure · beside the Goldendale Energy Storage Project, near Goldendale, Klickitat County, WA
Connection appliedchanged 2026-02-25
—requested
—offered
—energised
≥ 47 mowaiting since first filing
mediumconfidence · 4 sources
- Market
- United States · North America
- Grid
- US-OTHER · Other US (outside the ISOs)
- Place
- beside the Goldendale Energy Storage Project, near Goldendale, Klickitat County, WA
- Network
- —
- Announced
- 2026-02-25
- Connection applied
- 2022-12-31
- First reported by
- columbiariverkeeper.org · planned
- Dates it gives
- report dated 2026-02-26
load to begin 2026, 1,100 MW by 2033
Timeline
2022202420262028
before a connection offeroffer to powerpower ondelayed, paused, contested╷ milestone│ today
History
-
≤ 2026-02-25date: document dateon or before
stageAnnouncedconfirmed
- columbiariverkeeper.org press
Data center developer Stack Infrastructure is proposing to build a massive data center campus alongside the Goldendale Energy Storage Project
- goldendalesentinel.com press
As previously reported by The Sentinel, STACK has proposed developing approximately 598 acres of the former aluminum smelter property for a data center campus.
- columbiariverkeeper.org press
-
≤ 2022-12-31on or before
stageConnection appliedconfirmed
- compute-atlas.com press
958 MW per the 2022 load connection request between Klickitat PUD and BPA, which names IPI and STACK.
- goldendalesentinel.com press
The STACK project is also identified in large-load electrical interconnection requests maintained by Klickitat PUD and the Bonneville Power Administration.
- compute-atlas.com press
Newest first. Every step shows the source and the quote it rests on, checked against that source. Confirmed: a primary source (a register, a filing, the owner's own site) or two sites; a cancellation needs both. 1 source: one so far. Only confirmed dates enter medians and comparables. A stage is how far the project has got; a condition (delayed, contested, paused, cancelled) sits on top of the stage until a later event ends it. Unknown fields show as —.