The Hook Lab / Tracker / Asia / Malaysia / Bridge Data Centres MY07
Updated 2026-11-25
Tracker · Malaysia · TNB · Johor
Bridge Data Centres MY07
Bridge Data Centres · Desa Cemerlang, Ulu Tiram, Johor
Connection offeredchanged 2026-09-14
400 MWrequested
—offered
—energised
—waiting: no filing date on record
lowconfidence · 1 source
- Market
- Malaysia · Asia
- Grid
- TNB · TNB (Peninsular Malaysia)
- Place
- Desa Cemerlang, Ulu Tiram, Johor
- Network
- —
- Connection offered
- 2026-09-14
- First reported by
- W.Media · operating
- Dates it gives
- Land 2024-05
ESA 2024-11-29
phase 1 complete ~2025-09
phase 2 under construction 2025-2026
Who is on it
- Developer
- Bridge Data Centres · datacenterdynamics.com
Timeline
202420262028
before a connection offeroffer to powerpower ondelayed, paused, contested╷ milestone│ today
History
-
≤ 2026-09-14date: document dateon or before
stageConnection offered1 source
- DCD press
Southeast Asian data center developer Bridge Data Centres (BDC) has signed an Electricity Supply Agreement (ESA) with Tenaga Nasional Berhad (TNB). The ESA will deliver 400MW of energy to BDC's MY07 data center, which is currently under development in Johor Ulu Tiram, Malaysia.
- DCD press
Newest first. Every step shows the source and the quote it rests on, checked against that source. Confirmed: a primary source (a register, a filing, the owner's own site) or two sites; a cancellation needs both. 1 source: one so far. Only confirmed dates enter medians and comparables. A stage is how far the project has got; a condition (delayed, contested, paused, cancelled) sits on top of the stage until a later event ends it. Unknown fields show as —.