The Hook Lab / Tracker / Asia / Malaysia / UEM Sunrise and Logos Gerbang Nusajaya campus Updated 2026-11-25
Tracker · Malaysia · TNB · Johor

UEM Sunrise and Logos Gerbang Nusajaya campus

UEM Sunrise · Gerbang Nusajaya, Iskandar Puteri, Johor

Cancelledwithdrawn by proponentstage not on recordchanged 2025-06-25
360 MWrequested
—offered
—energised
—closed
lowconfidence · 1 source
Market
Malaysia · Asia
Grid
TNB · TNB (Peninsular Malaysia)
Place
Gerbang Nusajaya, Iskandar Puteri, Johor
Network
—
First reported by
Free Malaysia Today · cancelled
Dates it gives
MoU 2024-05
lapsed after Logos ownership change
confirmed scrapped 2025-06-25

Timeline

202420262028
before a connection offeroffer to powerpower ondelayed, paused, contested╷ milestone│ today

History

  1. ≤ 2025-06-25date: document dateon or before
    conditionCancelled1 sourcewithdrawn by proponent
    • Free Malaysia Today press
      UEM Sunrise Bhd’s deal to build a data centre campus in Gerbang Nusajaya, Johor, with Singapore firm Logos Infrastructure Holdco Pte Ltd has been scrapped.

Newest first. Every step shows the source and the quote it rests on, checked against that source. Confirmed: a primary source (a register, a filing, the owner's own site) or two sites; a cancellation needs both. 1 source: one so far. Only confirmed dates enter medians and comparables. A stage is how far the project has got; a condition (delayed, contested, paused, cancelled) sits on top of the stage until a later event ends it. Unknown fields show as —.

Report an error