The Hook Lab / Tracker / North America / United States / Apple Prineville data centre Updated 2026-11-25
Tracker · United States · US-OTHER · OR

Apple Prineville data centre

Apple · Prineville, OR

Planning lodgedchanged 2024-06-03
—requested
—offered
—energised
30 mowaiting since first filing
lowconfidence · 1 source
Market
United States · North America
Grid
US-OTHER · Other US (outside the ISOs)
Place
Prineville, OR
Network
—
Planning lodged
2024-06-03
First reported by
Apple · operating · opened 2012
Dates it gives
opened 2012-05

Timeline

202420262028
before a connection offeroffer to powerpower ondelayed, paused, contested╷ milestone│ today

History

  1. ≤ 2024-06-03date: document dateon or before
    stagePlanning lodged1 source
    • datacenterknowledge.com press
      Plans originally filed with local jurisdictions showed berms that would hide the initial Apple building.

Newest first. Every step shows the source and the quote it rests on, checked against that source. Confirmed: a primary source (a register, a filing, the owner's own site) or two sites; a cancellation needs both. 1 source: one so far. Only confirmed dates enter medians and comparables. A stage is how far the project has got; a condition (delayed, contested, paused, cancelled) sits on top of the stage until a later event ends it. Unknown fields show as —.

Report an error