TeraWulf Abernathy joint venture
TeraWulf · Abernathy
Announcedchanged 2025-10
168 MWrequested
—offered
—energised
—waiting: no filing date on record
highconfidence · 5 sources
- Market
- United States · North America
- Grid
- not settled yet
- Place
- Abernathy
- Network
- —
- Announced
- 2025-10
- First reported by
- TeraWulf · under construction
- Dates it gives
- delivery targeted Q4 2026
Who is on it
Timeline
202420262028
before a connection offeroffer to powerpower ondelayed, paused, contested╷ milestone│ today
History
-
2025-10
stageAnnouncedconfirmed
- sec.gov primary
WULF Signs a Joint Venture with Fluidstack for a 168 MW Critical IT Data Center in Texas
- sec.gov primary
On October 28, 2025, TeraWulf Inc. (“TeraWulf”) announced that its subsidiary Big Country Wulf LLC (the “TeraWulf Member”) had entered into an amended and restated limited liability company agreement (the “Joint Venture Agreement”) with Fluidstack CS I Inc. (the “Fluidstack Member”) to govern the terms of operation of FS CS I LLC (the “Joint Venture”), which will develop and operate a data center campus in Abernathy, Texas (the “Abernathy HPC Campus”).
- sec.gov primary
TeraWulf Inc. (Nasdaq: WULF) (“TeraWulf” or the “Company”), a leading owner and operator of vertically integrated, low-carbon digital infrastructure, today announced that it has executed a long-term high-performance computing (HPC) joint venture with Fluidstack,
- TeraWulf primary
The Abernathy Joint Venture was established in 2025 to develop a 168 MW critical IT load AI data center campus in Abernathy, Texas.
- DCD press
Under the agreement, the companies will develop and deliver 168MW of critical IT load (240MW gross) at a new 120-acre data center campus in Abernathy, Texas.
- sec.gov primary
Newest first. Every step shows the source and the quote it rests on, checked against that source. Confirmed: a primary source (a register, a filing, the owner's own site) or two sites; a cancellation needs both. 1 source: one so far. Only confirmed dates enter medians and comparables. A stage is how far the project has got; a condition (delayed, contested, paused, cancelled) sits on top of the stage until a later event ends it. Unknown fields show as —.