The Hook Lab / Tracker / Asia / South Korea / STT Seoul 1 Updated 2026-11-25
Tracker · South Korea · KEPCO · Seoul

STT Seoul 1

STT GDC / Hyosung · Gasan-dong, Geumcheon-gu, Seoul, Seoul

Announcedchanged 2021-12-31
30 MWrequested
—offered
—energised
—waiting: no filing date on record
lowconfidence · 1 source
Market
South Korea · Asia
Grid
KEPCO · KEPCO
Place
Gasan-dong, Geumcheon-gu, Seoul, Seoul
Network
—
Announced
2021-12-31
First reported by
Asia Economy · operating
Dates it gives
2026-06-16 opening ceremony

Who is on it

Operator
ST Telemedia Global Data Centres (STT GDC) · view.asiae.co.kr
Owner
STT GDC · datacenterdynamics.com

Timeline

20202022202420262028
before a connection offeroffer to powerpower ondelayed, paused, contested╷ milestone│ today

History

  1. ≤ 2021-12-31on or before
    stageAnnounced1 source
    • DCD press
      First announced in 2021, the facility was developed and will be operated through a joint venture between STT GDC (60 percent) and Hyosung Heavy Industries (40 percent).

Newest first. Every step shows the source and the quote it rests on, checked against that source. Confirmed: a primary source (a register, a filing, the owner's own site) or two sites; a cancellation needs both. 1 source: one so far. Only confirmed dates enter medians and comparables. A stage is how far the project has got; a condition (delayed, contested, paused, cancelled) sits on top of the stage until a later event ends it. Unknown fields show as —.