The Hook Lab / Tracker / Asia / South Korea / STT Seoul 1
Updated 2026-11-25
Tracker · South Korea · KEPCO · Seoul
STT Seoul 1
STT GDC / Hyosung · Gasan-dong, Geumcheon-gu, Seoul, Seoul
Announcedchanged 2021-12-31
30 MWrequested
—offered
—energised
—waiting: no filing date on record
lowconfidence · 1 source
- Market
- South Korea · Asia
- Grid
- KEPCO · KEPCO
- Place
- Gasan-dong, Geumcheon-gu, Seoul, Seoul
- Network
- —
- Announced
- 2021-12-31
- First reported by
- Asia Economy · operating
- Dates it gives
- 2026-06-16 opening ceremony
Who is on it
- Operator
- ST Telemedia Global Data Centres (STT GDC) · view.asiae.co.kr
- Owner
- STT GDC · datacenterdynamics.com
Timeline
20202022202420262028
before a connection offeroffer to powerpower ondelayed, paused, contested╷ milestone│ today
History
-
≤ 2021-12-31on or before
stageAnnounced1 source
- DCD press
First announced in 2021, the facility was developed and will be operated through a joint venture between STT GDC (60 percent) and Hyosung Heavy Industries (40 percent).
- DCD press
Newest first. Every step shows the source and the quote it rests on, checked against that source. Confirmed: a primary source (a register, a filing, the owner's own site) or two sites; a cancellation needs both. 1 source: one so far. Only confirmed dates enter medians and comparables. A stage is how far the project has got; a condition (delayed, contested, paused, cancelled) sits on top of the stage until a later event ends it. Unknown fields show as —.