The Hook Lab / Tracker / Europe / Switzerland / Stack Infrastructure Beringen data centre Updated 2026-11-25
Tracker · Switzerland · CH

Stack Infrastructure Beringen data centre

Stack Infrastructure · Beringen, Canton Schaffhausen

Under construction
30 MWplanned
—live
1source
Market
Switzerland · Europe
Grid
CH · Switzerland (Swissgrid)
Place
Beringen, Canton Schaffhausen
Owner
Stack Infrastructure
Dates the source gives
waste-heat feasibility study report dated 2022-12-13
Source
zh.ch

From its first public source so far, linked above, with the dates that source gives. Each step found in registers, filings and the press is added here with its source and the quote it rests on.

Report an error