The Hook Lab / Tracker / Europe / United Kingdom / Future Point Manchester Updated 2026-11-25
Tracker · United Kingdom · GB

Future Point Manchester

Carlton Power / Eclipse Power Optimise · Carrington, Greater Manchester

Connection offered
1,400 MWplanned
—live
1source
Market
United Kingdom · Europe
Grid
GB · Great Britain (NESO)
Place
Carrington, Greater Manchester
Owner
Carlton Power / Eclipse Power Optimise
Dates the source gives
grid connection date 2028
Source
eclipsepower.co.uk

From its first public source so far, linked above, with the dates that source gives. Each step found in registers, filings and the press is added here with its source and the quote it rests on.

Report an error