The Hook Lab / Tracker / Asia / Japan / Colt DCS Inzai campus (Inzai 1-4, Inzai 5 planned)
Updated 2026-11-25
Tracker · Japan · TEPCO · Chiba
Colt DCS Inzai campus (Inzai 1-4, Inzai 5 planned)
Colt DCS · Inzai, Chiba
New · 2025
70 MWplanned
—live
1source
- Market
- Japan · Asia
- Grid
- TEPCO · TEPCO Power Grid
- Place
- Inzai, Chiba
- Owner
- Colt DCS
- Opened
- 2025
- Dates the source gives
- Inzai 4 groundbreaking 2023-04
Inzai 4 phase 1 (4.8 MW) launched 2025-02-26
Inzai 4 full build 20 MW - Source
- coltdatacentres.net
From its first public source so far, linked above, with the dates that source gives. Each step found in registers, filings and the press is added here with its source and the quote it rests on.