 "approved_by": null,
 "count": 10,
 "questions": [
  {
   "id": "ride-through",
   "question": "A 120 MW data centre will connect at 132 kV through two 80 MVA transformers. The network requires the load to ride through a voltage dip to 0.3 pu lasting 400 ms at the connection point. Which equipment on the site is most likely to set the limit, and what evidence would you expect the network to ask for before accepting the connection?",
   "rubric": [
    "Identifies that the IT load itself is usually protected by the UPS, so the limit tends to be set by equipment outside the UPS: cooling (chillers, pumps and fans on variable-speed drives), contactors and control circuits, or the UPS's own transfer behaviour.",
    "Explains that undervoltage trips, drive DC-bus undervoltage or contactor drop-out can disconnect load during the dip, and that a UPS transferring to battery removes its load from the grid, so the network sees a sudden loss of load.",
    "Explains why the network cares: a large simultaneous loss of load raises frequency and voltage and can disturb other connections; and the load's return after the fault (reconnection inrush, step) matters too.",
    "Names concrete evidence: manufacturer ride-through curves or test reports for drives, UPS and contactors; protection and undervoltage settings; and dynamic (RMS and/or EMT) models or studies of the site's response, ideally confirmed by testing at commissioning.",
    "Notices that two 80 MVA transformers do not give N−1 firm capacity for about 120 MW (roughly 126 MVA at a typical power factor), or otherwise checks the supply arrangement's adequacy."
   ]
  },
  {
   "id": "load-loss",
   "question": "Several large data centres sit in one region of a transmission network. Why might the system operator be concerned about them during a transmission fault even if each one is individually compliant, and what would you recommend to reduce the risk?",
   "rubric": [
    "Explains common-mode behaviour: many sites with similar UPS and protection designs can all disconnect or transfer to backup for the same fault, so the combined load loss can be very large.",
    "Explains the system effects of a large sudden load loss: over-frequency, voltage rise and possible secondary trips, and that it may exceed the contingency the system is secured for.",
    "Mentions the return of load after the fault (many sites reconnecting at once, ramp or inrush) as a second risk.",
    "Recommends coordinated measures: ride-through requirements, controlled and staggered reconnection or ramp rates, sharing settings and models with the operator, monitoring and post-event reporting.",
    "Suggests studying the aggregate behaviour (regional dynamic studies), not only site-by-site compliance."
   ]
  },
  {
   "id": "harmonics",
   "question": "A 60 MW data centre with a large share of rectifier load (UPS and variable-speed drives) will connect at a 33 kV point where the fault level is modest and there is an existing capacitor bank nearby. What harmonic studies and mitigation would you plan?",
   "rubric": [
    "Plans an emission assessment against the limits allocated by the network (referring to a standard such as IEC 61000-3-6 or IEEE 519, or to the network's own allocation).",
    "Includes background (pre-existing) harmonic levels measured at the point of connection before connection.",
    "Identifies resonance risk with the nearby capacitor bank and cable capacitance, and plans a frequency (impedance) scan across operating conditions.",
    "Proposes suitable mitigation: low-harmonic equipment (active front-end UPS and drives), active or tuned / detuned passive filters, with care that filters do not create new resonances.",
    "Plans compliance measurement after energisation and as load grows in stages."
   ]
  },
  {
   "id": "protection",
   "question": "A new customer-owned 132/33 kV substation will supply a data campus. What protection and coordination matters must be settled with the network before energisation?",
   "rubric": [
    "Grading with the network's upstream protection: time and current margins so the customer's protection clears faults inside the site first.",
    "Transformer protection: differential and restricted earth fault, with inrush restraint, plus overcurrent backup.",
    "Earthing arrangement and earth-fault protection consistent with the network (how each side is earthed), and step and touch potential at the substation.",
    "Equipment and CT ratings checked against the fault level (switchgear breaking and making capacity, CT saturation).",
    "Interfaces with the network: intertrips or circuit-breaker-fail schemes, settings approval, and commissioning tests witnessed or reported to the network."
   ]
  },
  {
   "id": "weak-grid",
   "question": "A 300 MW load is proposed at a 220 kV point with a short-circuit ratio of about 3. What technical risks does the low short-circuit ratio create, and what would you specify or study?",
   "rubric": [
    "Explains that a low SCR means a weak point: larger voltage changes for the same power or reactive-power change, and less margin to voltage instability.",
    "Calls for voltage stability analysis (P–V / Q–V margins) and steady-state voltage limits across the load range and outages.",
    "Specifies reactive power capability or a power-factor range at the connection point, and considers dynamic support (e.g. STATCOM or synchronous condenser).",
    "Recognises converter-control interaction risks in weak grids and the need for EMT studies of the site's power-electronic equipment.",
    "Considers how the load's steps or ramps affect voltage at a weak point and proposes limits or mitigation."
   ]
  },
  {
   "id": "ai-load-swings",
   "question": "An AI training cluster's power draw can swing by tens of megawatts within seconds as jobs synchronise. Why might the network limit these swings, and how could the site comply?",
   "rubric": [
    "Explains the network effects of rapid, repetitive load changes: voltage fluctuation and flicker, and frequency disturbance in smaller systems.",
    "Mentions the risk of exciting oscillations or interacting with generator or converter controls when swings are periodic.",
    "Proposes on-site smoothing with fast storage (batteries or supercapacitors behind the meter).",
    "Proposes workload and IT-side controls: power capping, staggering or scheduling jobs, ramp-rate limits.",
    "Proposes measuring and reporting the site's actual power profile (high-resolution monitoring) to demonstrate compliance."
   ]
  },
  {
   "id": "redundancy",
   "question": "A data-centre developer says its design is 2N, so the grid connection does not need N−1. Explain how redundancy inside the data centre differs from security of the network supply, and what that means for the connection.",
   "rubric": [
    "Explains that 2N (or N+1) describes duplicated equipment inside the site (UPS, distribution, generators), which protects the IT load, not the network supply.",
    "Explains that N−1 at the connection concerns whether the supply survives the loss of one network element (line or transformer) without curtailment.",
    "Notes that with a non-firm supply the site may run on backup generation for long periods after a network outage, with fuel, emissions and cost consequences.",
    "Notes that the network may offer a non-firm connection with curtailment or run-back obligations, and that this is a commercial and technical choice to agree explicitly."
   ]
  },
  {
   "id": "enquiry",
   "question": "What information should a data-centre developer give the network in a connection enquiry so that the network can give a useful first response?",
   "rubric": [
    "Location and proposed connection point, with a single-line diagram of the intended arrangement.",
    "Maximum demand and how it grows in stages over time, with target dates.",
    "Load characteristics: power factor, ramp rates and step changes, and harmonic-producing equipment.",
    "Ride-through capability and protection philosophy of the site.",
    "On-site generation and storage (backup generators, batteries), and whether any will run in parallel with the network or export."
   ]
  },
  {
   "id": "backup-parallel",
   "question": "A data centre wants to run its backup generators in parallel with the network for testing and to support the grid. What changes, technically and in the approvals, compared with using them only in island mode?",
   "rubric": [
    "Recognises that paralleling makes the site a generator connection for those periods, bringing generator requirements and possibly market registration.",
    "Mentions anti-islanding / loss-of-mains protection and synchronising arrangements.",
    "Mentions the generators' contribution to fault level and the need to check switchgear and network protection.",
    "Mentions environmental limits on running hours and emissions permits.",
    "Mentions closed-transition transfer limits and the need to agree operating procedures with the network."
   ]
  },
  {
   "id": "flexibility",
   "question": "Could a data centre's UPS batteries be used to provide fast frequency response to the grid? What limits this, and what would need to be in place?",
   "rubric": [
    "Recognises that it is technically possible because UPS batteries and inverters can respond quickly.",
    "Identifies the main limit: energy must stay reserved for the UPS's own ride-through and autonomy, so only a margin can be offered.",
    "Mentions battery life, cycling and warranty effects.",
    "Mentions metering, telemetry, testing and market or programme registration (directly or via an aggregator).",
    "Mentions the operator's tolerance of risk to IT availability and the controls needed to protect it."
   ]
  }
 ]
}